Andalusian planning law: licences, illegal builds and AFO status
Law 7/2021 on the Promotion of Territorial Sustainability in Andalusia (LISTA), selected provisions for anyone buying a villa, a rural house or a plot: what needs a licence and what a responsible declaration, the ban on subdividing rural land, the six-year limit for the council to act against unlicensed works and the cases where there is no limit, the “assimilated to out of zoning” status (AFO) for old irregular buildings, utility connections, and fines.
The three questions for a rural property
Was it built with a licence? If not, has the six-year period in article 153.1 run out — and is the land outside the cases in article 153.2 where the council can act at any time (public domain, coastal influence zone of rural land, risk areas, green spaces, rural subdivisions)? And has the council issued an AFO resolution under article 173? Without that resolution the building cannot lawfully connect to utilities or undergo works (article 173.3), and even with it the building is not legalised (article 174.1). The AFO status appears in the Land Registry as a marginal note (article 174.6), so a registry extract is the first document to ask for.
Title V. Urban development execution (selected)
Article 91. Urban subdivision
1. The following is considered urban subdivision (parcelación urbanística):
a) On land subject to the regime of urban land, any simultaneous or successive division of land, estates, plots or building plots.
b) On land subject to the regime of rural land, the simultaneous or successive division of land, estates or plots into two or more lots which, regardless of the provisions of this Law and of agricultural, forestry or similar legislation, may lead to the formation of new settlements.
2. Acts revealing a possible urban subdivision are those in which, through the interposition of companies, horizontal divisions or assignments of use or undivided shares of a piece of land, estate or plot, or of a share, participation or other corporate right, there may be several holders entitled to the individualised use of a part of the property equivalent or comparable to the cases in the preceding paragraph, and the stated intention not to make agreements on use shall not exclude that application.
3. Licences for subdivision, segregation and division of the land, airspace and/or subsoil shall require the reports or authorisations of the sectoral Administration, according to their purpose.
4. No public deed containing an act of subdivision, segregation or division may be authorised or registered without the required licence or act constituting the prior municipal control incorporating the precise georeferencing, which notaries must attest in the corresponding deed.
Municipal licences for subdivisions, segregations or divisions are granted and issued on condition that the public deed containing the act of subdivision is filed with the municipality within the three months following their grant or issue. Failure to file the public deed in time determines the lapse of the licence by operation of law, without the need for any implementing act. The filing period may be extended for justified reasons. In the same deed containing the act of subdivision and the relevant attested licence, the parties must require the authorising notary to send, through the regulatory channel, an authorised copy of it to the corresponding municipal council, which shall satisfy the protection requirement referred to in the preceding paragraph.
5. The assignment of undivided shares resulting from transfers on death or between spouses or unmarried partners shall not require a licence, unless fraud of law is shown.
6. For registrations of subdivision, segregation or division, the Land Registries shall require compliance with the preceding paragraphs, on the terms provided for in the basic State legislation.
7. Urban subdivisions are prohibited on rural land.
Title VI. Building activity (selected)
Article 137. Acts subject to municipal planning licence
1. Works, constructions, buildings, installations, infrastructure and use of land, including the subsoil and airspace, and divisions, segregations and urban subdivisions, including the various forms of horizontal property regulated in the legislation on the matter, are subject to prior municipal planning licence.
All of this is without prejudice to the obligation to obtain beforehand the concessions, authorisations or reports that are appropriate under this Law or the applicable sectoral legislation.
2. The following do not require a prior licence:
a) Acts subject to responsible declaration or prior notification, under article 138.
b) Works that are the subject of execution orders, or acts necessary to execute administrative or judicial decisions aimed at restoring territorial and planning legality.
c) Divisions, segregations and urban subdivisions contained in reparcelling projects.
d) The constitution and modification of real-estate complexes in the cases excepted in State legislation.
e) Urbanisation acts included in duly approved urbanisation projects. Nor shall urbanisation acts complementary to building actions contained in the projects defining them require a licence.
f) Agricultural, livestock, forestry, hunting, mining and any other uses linked to the rational use of natural resources that do not entail the transformation of their rural nature, on the terms to be established by regulation, nor involve the construction of constructions, buildings and installations.
The consolidated text notes that a highlighted phrase of letter f) was declared unconstitutional and void by Constitutional Court judgment 25/2024 of 13 February (BOE-A-2024-5836). The highlighting is not reproduced in the text we worked from, so the annulled words are not marked here; check the judgment.
g) Acts promoted by Public Administrations in the cases excepted in article 139.
h) Those excepted by the applicable sectoral legislation.
3. Without prejudice to the grounds of nullity provided for in the legislation in force, licences, execution orders, declarations of out of zoning or assimilated status, or other municipal authorisations or approvals granted contrary to the provisions of the planning regulations shall be void as of right where their object is the carrying out of the acts and uses contemplated in article 153.2.
4. Companies marketing or installing prefabricated buildings capable of housing a residential use, whose placement is subject to licence or responsible declaration, shall require for their installation, sale, rental or assignment of use evidence that the licence has first been obtained or the responsible declaration filed with the municipal council, and must keep a copy of those documents for six years from the date of the legal act.
Article 138. Acts subject to responsible declaration or prior notification
1. The following actions are subject to responsible declaration, within the framework of State legislation:
a) Works of minor constructional scope and technical simplicity that do not require a project under the legislation in force. Municipal Ordinances may exempt from responsible declaration those cases in which the actions have no effect on planning or building regulations, without prejudice to cases in which, under the applicable sectoral legislation, such works must be subject to some form of administrative intervention.
b) Works on existing buildings or installations that conform to territorial and planning regulations or are in the legal situation of out of zoning, located on urban land not subject to urban transformation actions, provided that they do not alter the parameters of occupation and height, or involve increases in buildability or in the number of dwellings.
c) Works on existing buildings and installations that conform to territorial and planning regulations or are in the legal situation of out of zoning, located on rural land, whose purpose is to improve energy efficiency, integrate renewable energy installations or reduce their environmental impact, provided that they do not involve new construction or an increase in the built area.
d) Occupation or use of buildings or installations covered by a prior licence or responsible declaration for works, provided that they are completed and conform to them and their use conforms to the applicable rules.
e) Occupation and use of existing buildings that conform to the planning in force or are in the legal situation of out of zoning, located on urban land not subject to urban transformation actions, provided that they have not undergone works.
f) Changes of use in buildings, or parts of them, that conform to territorial and planning regulations or are in the legal situation of out of zoning, located on urban land not subject to urban transformation actions, provided that they do not increase the number of dwellings and the use to be implemented is among those permitted by that planning.
g) Total or partial demolition of constructions or buildings, provided that they are not subject to a protection regime under historical heritage legislation, territorial planning instruments or urban planning instruments, and are not included in the surroundings or within the delimited area of a protected asset.
h) Earth movements and levelling on urban land that is not in an Archaeological Zone or Archaeological Easement and that are independent of urbanisation, building or construction projects, in which case they shall follow the regime provided for those.
2. The possibility of limiting the responsible declarations of occupation and use in paragraph 1 to parts of the buildings executed shall be developed by regulation, establishing the requirements and guarantees for their filing.
3. The responsible declaration shall be accompanied by the technical project or descriptive and graphic report of the building required and compulsory according to the type of building, installation, use and activity where it enables works to be carried out, by the final works certificate where it enables occupation or use of new works, or by the descriptive and graphic certificate where it enables occupation or use of existing buildings.
4. Where actions subject to responsible declaration require some prior administrative authorisation or report for the exercise of the right, under the applicable sectoral rules, filing the responsible declaration requires those reports or authorisations or, where applicable, the administrative certificate of the silence produced, to have been obtained and be available beforehand.
5. The responsible declaration entitles the person to carry out the intended action from the day it is filed, provided that it is accompanied by the documents required under the legislation in force, and without prejudice to the powers of subsequent verification, control and inspection.
6. Any identifying data that must be brought to the Administration’s attention for the exercise of a right shall be the subject of prior notification to the Administration, in particular:
a) Changes of holder of licences and responsible declarations. Failure to file that notification shall mean that acquirer and transferor are jointly and severally subject to the liabilities that may arise from the action carried out under that licence.
b) The start of works.
c) Extensions of the period for starting and completing works with a licence or responsible declaration in force.
7. In accordance with the basic land legislation, powers contrary to the legislation or the applicable planning instrument shall in no case be understood to be acquired by responsible declaration or prior notification. Actions subject to responsible declaration carried out without it having been filed, where required, or exceeding what was declared, shall be considered actions without licence for all purposes, and the same regime of protection of legality and penalties as for works and uses without licence shall apply to them.
Article 141. Time validity and lapse of the means of administrative intervention
1. Licences shall be granted for a fixed period, both for starting and for completing the acts covered by them, except for actions which, by their nature, have indefinite validity. Where not expressly determined, they shall be deemed granted under the legal condition of observing one year to start the works and three years to complete them.
These periods shall be counted from the day following notification of the licence and shall be suspended where the interested party cannot meet them for reasons attributable to the Administration.
2. The periods for starting and completing the works may be extended on justified grounds, before they expire and for a period not exceeding that initially agreed, by filing a prior notification. The extension to start the works may not be exercised where there are changes in the planning in force at the time the licence was granted.
3. The body competent to grant the licence shall declare, ex officio or at the request of any person, its lapse, after hearing the interested party, once any of the periods referred to in paragraphs 1 and 2 have passed and not been met. The declaration of lapse shall extinguish the authorisation, and the acts may not be started or continued unless a new licence is applied for and obtained. Once two months have passed from notification of the declaration of lapse without the licence having been applied for or, where applicable, the licence applied for having been refused, the corresponding plot or building plot shall be declared to be in the situation of execution by substitution, on the terms of article 136, or, where applicable, the corresponding planning discipline procedure shall be initiated.
4. The responsible declaration authorises the acts covered by it to be carried out for a period that may not exceed six months to start the actions and two years to complete them, except for actions which, by their nature, have indefinite validity. The initial day of the calculation shall be the date the responsible declaration is filed with the corresponding municipal council, and notification of an extension may be filed for justified reasons and for a new period not exceeding half that initially established, before the end of the periods determined, provided that the action covered by the responsible declaration conforms to the planning in force at the time the extension is requested. Once the periods indicated have passed, the body competent to verify the actions covered by the responsible declaration shall declare its effects lapsed, requiring a new responsible declaration to be filed, without prejudice, where applicable, to the initiation of the corresponding planning discipline procedure. The period of validity of the responsible declaration shall be suspended if it cannot be executed for reasons attributable to the Administration.
Article 142. Access to services by supply companies
1. Electricity, water, gas and telecommunications supply companies shall require, for the provisional contracting of the respective services, evidence of the works licence or execution order or authorisation constituting the prior municipal control, or of the filing with the municipality of the responsible declaration or notification where appropriate, setting as the maximum duration of the contract that established in the enabling title for completion of the works. Once that period has passed, the service may not continue to be provided, unless evidence is given that notification of the extension of the period for starting or completing the works with a licence or responsible declaration in force has been filed with the competent Administration.
2. The companies mentioned in paragraph 1 shall require, for the definitive contracting of the respective services, the licence of occupation or use, responsible declaration or notification, in the cases where appropriate under this Law or the sectoral rules, accompanied by the documents inseparable from the occupation or use indicated above. The administrative decision on the declaration of the legal situation of out of zoning or of the situation assimilated to out of zoning, or the administrative certificate of the regime applicable to buildings completed before the entry into force of Law 19/1975 of 2 May reforming the Law on the Land Regime and Urban Planning, and of those for which the period for adopting measures to restore planning legality had passed at the entry into force of Law 8/1990 of 25 July on the Reform of the Planning Regime and Land Valuations, shall have the same effect.
3. Supply companies shall permit the contracting of supplies during the execution of urbanisation works in groups of irregular buildings included as urban transformation actions on rural land, for those buildings that show authorisation for their provisional use until the total or partial acceptance of the remaining urbanisation works.
Title VII. Territorial and planning discipline (selected)
Article 151. Restoration of legality in respect of actions without the required title or in breach of it
1. In respect of actions carried out without the licence or enabling title required by this Law or in breach of its terms, the Administration shall agree to their legalisation or impose the measures necessary to bring reality into line with territorial and planning regulations, depending on whether or not they conform to them. The cases and conditions in which, exceptionally and applying the principle of proportionality, legalisation may be possible even though there are non-substantial elements of non-conformity with the applicable planning, where the measures necessary to bring reality into line with territorial and planning regulations are impossible or very difficult to carry out, shall be developed by regulation.
2. Actions shall be legalised by obtaining the corresponding enabling title for their execution or by bringing them into line with it and, in any event, shall require the prior obtaining of the administrative authorisations and reports necessary under the applicable sectoral laws.
3. The measures to bring reality into line with territorial and planning regulations shall consist of the prohibition on starting or continuing the action in progress, cutting off supplies, dismantling of services, infrastructure or similar installations, total or partial demolition, clearing, reconstruction, regrouping of plots and any others necessary according to the content and scope of the illegality. These measures shall be specified by regulation.
The decision of the procedure to restore legality may include the measures necessary to guarantee its execution, which may consist of maintaining any provisional measures that may have been adopted.
4. In the case of urban subdivisions, legality shall be restored by regrouping the plots through compulsory reparcelling, in the form and on the conditions determined by regulation. Plots on which there are buildings for which the time limit in article 153 has passed shall be excluded from regrouping.
Article 153. Period for restoring territorial and planning legality
1. The measures, provisional or definitive, to restore territorial and planning legality provided for in this chapter may only be validly adopted while the acts or uses are being executed, carried out or developed and within the six years following their complete termination or, if later, from the appearance of external signs that make them known. In the case of a use, the six years shall be counted from the appearance of external signs making its actual implementation known.
Acts and uses carried out on rural land under special protection by sectoral legislation shall be subject to the period established in the preceding paragraph, without prejudice to the periods established by that legislation for the adoption of measures to restore the altered physical reality by the competent sectoral body.
2. The following actions are excepted from the preceding rule, so that those measures may be adopted at any time:
a) Those carried out on public domain and protection easements.
b) Those carried out on preserved rural land with real risks of landslides, slips, floods or similar, or that generate or increase them, while those risks subsist in accordance with article 14.1 b).
c) Those carried out on rural land in the coastal influence zone.
d) Those affecting real property individually registered in the General Catalogue of the Historical Heritage of Andalusia.
e) Those affecting green zones and open spaces.
f) Urban subdivisions on rural land, except those affecting plots on which there are buildings for which the time limit in paragraph 1 of this article has passed. The foregoing exception, in relation to the time limit, shall apply only to the specific plot on which the building meeting those requirements stands, and shall not include the rest of the plot or plots subject to the subdivision. The time limit shall in no case apply to plots in any of the cases contemplated in the preceding letters of this paragraph.
Article 159. Common rules (paragraph 2)
2. The Administration that has issued the act or agreement on territorial or planning discipline shall record in the Land Registry, in the form and with the effects provided in the legislation governing it, the initiation of the procedures regulated in this chapter and the provisional and definitive measures adopted, as well as the limitations of illegal buildings in respect of which, owing to the passage of time, it is not possible to order their adaptation to territorial and planning regulations. It must also request the cancellation of the corresponding entry when the administrative act to which it refers ceases to have effect.
The costs paid by the competent Administration for these items shall be passed on to the offenders in a procedure separate from the territorial or planning discipline procedure from which they derive. Where there are several persons responsible, the charge shall be demanded jointly and severally.
Article 162. Fines
1. Infringements shall be penalised with the following fines:
a) Minor infringements, with a fine of 600 to 2,999 euros.
b) Serious infringements, with a fine of 3,000 to 29,999 euros, unless the value of the works executed or of the land affected or of the damage caused to the protected assets is higher, in which case the fine may reach up to seventy-five per cent of those values.
c) Very serious infringements, with a fine of 30,000 to 120,000 euros, unless the value of the works executed or of the land affected or of the damage caused to the protected assets is higher, in which case the fine may reach up to one hundred and fifty per cent of those values.
2. Where only part of the action is illegal, the percentage shall be applied to the value of that part. To determine the value of the works, those executed shall be taken into account. For the value of the land, its potential sale value or that of similar land shall be taken into account. Criteria for these calculations may be established by regulation.
Article 166. Persons responsible for infringements (paragraphs 1 to 3)
1. Natural and legal persons, and where applicable the entities without legal personality referred to in the public-sector legal regime rules, that carry out the conduct defined with intent or fault are responsible for the infringements of this Law. Without prejudice to the foregoing, the rules in the following paragraphs shall apply.
2. In the case of works and installations without the required enabling title or without having filed the responsible declaration or in breach of its terms, the developer, the entrepreneur, the builder executing the works and the technician directing them shall be penalised. The owner of the land or of the building shall be presumed to be the developer, unless proven otherwise.
3. In the case of subdivisions without an enabling title, in addition to the initial owner of the land, those who, in the exercise of their professions, cooperate with an act without which it would not have been carried out, and the acquirers, in proportion to the assignment of use, share or participation acquired, shall be penalised.
Article 169. Limitation
1. Serious and very serious infringements are time-barred after four years and minor infringements after one year. As regards the start of these periods and their interruption, the public-sector legal regime rules shall apply. The period shall also be interrupted during the investigation of criminal proceedings and the actions of the Public Prosecutor, with the knowledge of the accused, and shall restart with notification of the Public Prosecutor’s decision or the ruling of the judicial authority. In the case of infringements with a licence or other title, the limitation period shall begin to run from the annulment of the enabling title.
Where the infringement has no external signs, the initial day shall be postponed to that on which such signs appear.
2. Penalties for serious and very serious infringements are time-barred after three years and for minor infringements after one year. As regards the start of these periods and their interruption, the public-sector legal regime rules shall apply, with the following additional rules:
a) Where suspension of the penalty has been agreed by judicial decision or by announcement of a contentious-administrative appeal, the period shall restart when the judicial authority rules.
b) The provisions of the public-sector legal regime rules on the presumed dismissal of an ordinary administrative appeal shall also apply to the appeal for reconsideration.
Title VIII. Environmental and territorial adaptation measures for irregular buildings (selected)
Article 173. The situation assimilated to out of zoning
1. Completed irregular buildings, on any class of land and whatever their use, in respect of which it is not possible to adopt measures to protect planning legality or to restore the disturbed legal order because the period for exercising them under the planning legislation has passed, are in the situation assimilated to out of zoning (asimilado a fuera de ordenación).
2. The municipal council is responsible for processing and deciding the procedure for recognising the situation assimilated to out of zoning, after requiring the mandatory sectoral reports and authorisations, and must expressly indicate any pending criminal proceedings that may affect the building. The maximum period for deciding shall be six months. Once this period has passed without an express decision, the application shall be deemed rejected by administrative silence. If the procedure was initiated ex officio, it shall lapse.
3. The irregular buildings referred to in paragraph 1 may not access basic services, nor may any works be carried out on them, until the administrative decision recognising the situation assimilated to out of zoning has been issued, except those that the municipal council orders to be carried out to guarantee safety and health conditions.
4. Recognition of the situation assimilated to out of zoning shall not be granted for irregular buildings for which the period for adopting measures to protect planning legality and restore the disturbed legal order under this Law has not passed, nor for buildings that do not meet the minimum safety and health conditions required for habitability or for the use to which they are put, unless the works necessary to achieve those conditions have first been carried out by order of the municipal council; nor for irregular buildings on land affected by natural processes or human activities generating real risks of erosion, landslides, slips, floods or other natural, technological or other risks, unless the measures required by the competent Administration to avoid those risks have first been adopted.
5. The minimum safety and health conditions of cave dwellings in their traditional areas shall be established by regulation.
Article 174. Effects of the declaration assimilated to out of zoning
1. The declaration that an irregular building is assimilated to out of zoning does not entail its legalisation, nor does it produce effects on the other procedures to which the action carried out contrary to the legal order may have given rise, and is without prejudice to the jurisdictional power to judge and enforce judgments.
2. In the case of urban subdivisions on any class of land, the declaration of assimilation to the out of zoning regime shall include the building and the plot on which it stands, whose area, where there are two or more buildings on the same registered plot or, failing that, cadastral plot, shall coincide with the existing boundaries, and these matters must be reflected in the declaration assimilated to out of zoning.
This regime shall also apply to plots on which there are irregular buildings for which the time limit in article 153.1 has passed and which are on subdivisions whose enabling title has been declared void, without prejudice to any judicial decisions that may be issued in enforcement of judgments.
On rural land, that declaration shall have the effects of the planning licence required by article 25.1.b) of Law 19/1995 of 4 July on the Modernisation of Agricultural Holdings, and shall be subject to the lapse provided for segregation licences in this Law.
3. Where buildings recognised as assimilated to out of zoning do not have access to the basic services of sanitation, gas, water and electricity provided by supply companies, or where these have been installed without the required authorisations, access to them may be authorised provided that no works are needed other than those necessary for connection to the existing infrastructure networks. The companies shall show the viability of the connection on these terms and shall require the decision recognising the situation assimilated to out of zoning for contracting the services, and shall ensure compliance with the applicable sectoral rules.
4. Recognition that the building meets the minimum safety and health conditions determines the physical fitness of the building for use, but does not presuppose compliance with the requirements and conditions that may be required to authorise the activities that are or may be carried out in it.
5. The effects of the decision shall be without prejudice to what may be agreed in the corresponding urban planning instrument regarding the development, planning and use of the buildings recognised as assimilated to out of zoning.
6. The declaration assimilated to out of zoning shall be recorded in the Land Registry by a marginal note on the registry page of the property subject to that declaration, on the terms established in State legislation.
7. In buildings declared to be in the situation assimilated to out of zoning, changes of use compatible with territorial and planning regulations and conservation and refurbishment works, including consolidation works that do not entail an increase in occupation or built volume, may be authorised through the corresponding licences, unless this is necessary for the execution of auxiliary elements required by the applicable sectoral rules.
Where this sits
For tourist lets in Andalusia see the tourist dwellings page; for protected housing and the general housing infringements, the Andalusian Housing Act page. The Land Registry and the protection of a good-faith purchaser are on our Mortgage Act page.
Related on voixa.es: Personal tax in Andalusia; Spain’s 100% property tax for non-EU buyers: what happened.
Nothing here is advice on your own position, and this reading is not the official text. Where the wording matters to a decision, read it against the Spanish original published in BOJA.