Catalan Urban Planning Act: licences, plot division, maintenance and ruin (articles 187 to 198)
Catalan Urban Planning Act (consolidated text approved by Legislative Decree 1/2010), articles 187 to 198: the acts that require a planning licence or a prior notification and the acts exempt from both, the legal regime and lapse of planning licences, and acts promoted by public administrations. It also covers plot division and the plot division licence, the indivisibility of plots and properties, the duties of use, conservation and rehabilitation with enforcement orders, and the declaration of a state of ruin.
Note in the consolidated text: Bear in mind that references to the planning licence must be understood as made to the prior notification where that intervention regime replaces the planning licence regime, as established by additional provision 3.1 of Law 16/2015 of 21 July. Ref. BOE-A-2015-9208.
Title VI. Intervention in building and in the use of the land and the subsoil
Chapter I. Planning licences and plot divisions
Section 1. Planning licences
Article 187. Acts subject to a planning licence
1. The following acts are subject to a prior planning licence, with the exceptions established by article 187 ter:
a) Earthworks and the levelling of land.
b) Plot divisions.
c) The construction of new buildings and intervention in existing buildings which, under the legislation on building regulation, require a technical project to be drawn up, and total or partial demolition.
d) The first use and partial occupation of buildings.
e) The change of buildings to a residential use.
f) The extraction of aggregates and the working of quarries.
g) The accumulation of waste and the deposit of materials that alter the characteristics of the landscape.
h) The installation of greenhouses or similar installations, unless the perimeter walls of these installations are less than one metre high.
i) The felling of tree stands or shrub vegetation.
j) The opening, paving and modification of rural tracks.
k) The constitution or modification of a horizontal property regime, simple or complex.
l) One-off urbanisation works not included in an urbanisation project.
m) The installation of prefabricated houses or similar installations, whether provisional or permanent.
n) The installation of infrastructure for energy supply, water, sanitation, telephone or other similar services, and the placing of antennas or telecommunications devices, except infrastructure relating to public electronic communications networks which, under the telecommunications legislation, is subject to the established regime of responsible declaration.
o) Installations producing electricity, except those relating to the installation of photovoltaic solar panels and wind installations for self-consumption, on the terms established by article 9 bis.
p) The use of dwellings for tourist use in municipalities with problems of access to housing and in municipalities at risk of upsetting the balance of the urban environment through a high concentration of dwellings for tourist use.
2. The following are also subject to a prior planning licence, with the exceptions established by article 187 ter:
a) Intervention in assets subject to a cultural or planning heritage protection regime.
b) Provisional uses and works.
c) The acts referred to in article 187 bis, except those in letters g), h) and y), carried out on non-developable land and undelimited developable land.
[The Spanish text reads “g), h) e y)”; article 187 bis has letters a) to i) only.]
Article 187 bis. Acts subject to prior notification
The following acts are subject to prior notification, with the exceptions established by articles 187.2 and 187 ter:
a) New constructions and installations, and works of extension, renovation, modification, rehabilitation or total or partial demolition of existing constructions and installations which, under the legislation on building regulation, do not require a technical project to be drawn up.
b) The first use and occupation of buildings.
c) The change of use of buildings and installations, except to residential use.
d) The construction or installation of walls and fences.
e) The placing of advertising signs and hoardings visible from the public highway.
f) The execution of legal transactions which, without constituting or modifying a horizontal property regime, simple or complex, mean an increase in the number of dwellings, establishments or other units capable of independent private use compared with those authorised in an earlier planning licence.
g) Acts subject to intervention carried out on non-developable land and undelimited developable land that are covered by a specific action project or by an urban development plan regulating the land concerned in the same detail, provided that they do not require a technical project to be drawn up under the legislation on building regulation.
h) Installations producing electricity by means of photovoltaic solar panels and wind installations for self-consumption, on the terms established by article 9 bis.
i) Works of connection, replacement, test boreholes and repair of breakdowns of the technical service infrastructure referred to in letter a) of article 34.5 bis, except those subject to the regime of responsible declaration established by the telecommunications legislation, as well as underground power lines under the pavement up to 25 metres without street crossings, and overhead power lines up to 50 metres without installing supports and without street crossings.
Article 187 ter. Acts not subject to intervention by means of a planning licence or prior notification
The following acts are not subject to intervention by means of a planning licence or prior notification:
a) Urbanisation works included in urbanisation plans or projects.
b) Plot divisions included in reparcelling projects.
c) Acts and works to be carried out in compliance with an enforcement order or a restoration order, if they do not require a technical project or if the order itself, or the act ordering its substitute enforcement, incorporates the required technical project.
d) On non-developable land and undelimited developable land:
First. Earthworks, the levelling of land, the opening, paving and modification of rural tracks and the felling of tree stands or shrub vegetation carried out under a forest management instrument or with the intervention of the forestry administration and of the administration competent in environmental matters.
Second. The felling of tree stands or shrub vegetation carried out with the intervention of an administration competent in the protection of the public domain and of the administration competent in environmental matters.
Third. Water points for the prevention of forest fires carried out under a forest management instrument or with the intervention of the forestry administration and of the administration competent in environmental matters.
Article 188. Legal regime of planning licences
1. Planning licences must be granted in accordance with this Law, urban planning and the municipal by-laws.
2. Competence and the procedure for granting and refusing planning licences are governed by the local government legislation. Once the maximum period has elapsed without notification of the grant of the licence applied for, the persons concerned are entitled to treat it as granted by administrative silence, unless it concerns the following acts:
a) Earthworks and the levelling of land on non-developable land.
b) New construction, building and installation works on non-developable land or, on any class of land, new building works which, under the legislation on building regulation, require a technical project to be drawn up.
c) The provisional or permanent installation of prefabricated houses or similar installations on non-developable land.
d) The felling of tree stands or shrub vegetation arising from the legislation on the protection of the public domain.
e) Acts that contravene planning legality.
3. The file for granting the planning licence must include the technical and legal reports. The prior report of the secretary of the town council is mandatory whenever the previous reports conflict in their interpretation of the applicable planning rules. It is also mandatory where there is no other legal assistance. Every refusal of a planning licence must state reasons.
3 bis. Within the procedure for granting and refusing planning licences, each municipality may require, as a prior requirement to accompany the licence application or the prior notification, the submission of a technical suitability report. The purpose of the technical suitability report is to verify that the technical project or the technical documentation complies with the State and regional rules that must be checked in municipal intervention procedures, and that the documentation submitted meets the requirements of documentary completeness, sufficiency and suitability required by the municipal by-laws. The issue of this report may be entrusted to a technical professional association or to a collaborating entity duly authorised by the Administration. These reports have the same legal validity as those issued by the Administration staff responsible for these functions.
Technical professional associations or collaborating entities shall be authorised to act throughout Catalonia by the directorate general of the Generalitat competent in urban planning, in accordance with the implementing decree, without prejudice to the municipal by-laws being able to regulate their own collaboration regime for the exercise of verification and control functions, and the approval of the authorisation system where applicable, in accordance with Law 26/2010 of 3 August on the legal regime and administrative procedure of the public administrations of Catalonia and the other applicable rules.
Where the town council has regulated the submission of a technical suitability report issued by an authorised entity, the municipal technical services need only report on, and assume responsibility for, the conformity of the licence applied for or of the prior notification with the planning and municipal rules. The authorised entities that issue the technical suitability reports are liable for damage originating in defects that ought to have been disclosed in those reports and that are directly related to the matters covered by the report.
3 ter. (Repealed)
4. Where the planning licence establishes an adjustment of alignments and grade levels, the physical characteristics of the plots and their development rights may not be altered. This adjustment must be made by means of a setting-out act, to which all the owners concerned must be summoned.
5. The arrangement of building volumes, in accordance with the parameters set by planning, may be specified in the planning licence if it has not been determined by urban planning. In this case, the specific documentation determined by the regulation is required.
6. All files opened with an application for a planning licence to authorise new building, replacement or rehabilitation works, provided that their purpose is to promote and build publicly protected housing, are considered matters of a homogeneous nature, in accordance with the rules on administrative procedure, for the purposes of their administrative processing.
Article 189. Lapse of planning licences
1. Every planning licence for carrying out works must set a period for starting them and another for finishing them, in accordance with the principle of proportionality. If the licences do not set them, the period for starting the works is one year and the period for finishing them is three years.
2. The planning licence lapses if, at the end of either of the periods referred to in paragraph 1, or the corresponding extensions, the works have not been started or have not been finished. For these purposes, the licence document must include the corresponding warning.
3. If the planning licence has lapsed, the works may not be started or continued unless a new licence is applied for and obtained, conforming to the planning regulation in force, except in cases where the suspension of the granting of licences has been agreed.
4. The holders of a planning licence are entitled to obtain an extension of both the period for starting and the period for finishing the works, and obtain it by operation of law for half of the period concerned, if they apply for it with justification before the established periods run out. A licence extended by this procedure is not affected by the resolutions regulated by article 73.
5. Once the planning licence has lapsed, the competent municipal body must declare this and order the file to be closed, of its own motion or at the request of third parties and after hearing the holder.
Article 190. Acts promoted by public administrations
1. The acts specified in article 187 and promoted by bodies of the State or of the Generalitat or by public-law entities that administer State or regional assets must likewise be subject to a municipal licence, with the exceptions provided for by sectoral legislation. Acts of local entities that do not have competence to grant the licence are also subject to a municipal licence.
2. The minister competent by reason of the subject matter may, for reasons of urgency or exceptional public interest that so require, decide to send the project concerned to the relevant town council so that, within one month, it notifies whether or not the project conforms to the urban planning in force. If it does not conform, the department concerned must send the file to the minister for Territorial Policy and Public Works, who must refer it to the Government after a report from the Territory Commission of Catalonia. The Government must decide whether the project should be carried out immediately and exempt from the licence and, in that case, must order the start of the procedure to amend or revise urban planning, following the procedure established by this Law.
3. The town council may only order the suspension of works where they are intended to be carried out without, or contrary to, the notification of conformity with urban planning and without the Government’s decision on whether the project should be carried out. The suspension must be communicated to the body that drafted the project and to the minister for Territorial Policy and Public Works.
4. In the case of State works, the procedure is that regulated by the applicable legislation. Before the decision of the Council of Ministers, the minister for Territorial Policy and Public Works must issue the corresponding report.
Section 2. Plot divisions
Article 191. Plot division
1. Plot division (parcelación urbanística) means:
a) Any simultaneous division or successive segregation of land into two or more lots, on any class of land, which, by reason of the physical characteristics of the land, its delimitation by existing or newly created roads, the provision of services or the buildability described by the division operation, facilitates or is intended to facilitate the construction of buildings or installations to be used for urban uses.
b) Any operation with the same purposes as those specified in letter a in which, without division or segregation of properties, undivided parts of a particular property are sold or leased, incorporating the right to exclusive use of specific parts of the land.
c) The formation of associations or companies in which the status of member or the holding of shares or interests incorporates the right of exclusive use referred to in letter b.
2. With regard to the specific parts referred to in paragraphs 1.b and 1.c, there must be conditions of size and description that would rationally require the rural use of the parent property from which they come to be changed.
3. Any division or segregation that facilitates or is intended to facilitate the construction of buildings or the establishment of uses that are not permitted on non-developable land is considered unlawful.
Article 192. Plot division licence
1. Every plot division must be the subject of a licence, except one contained in a reparcelling project and other exceptions regulated by regulation.
2. To give effect to paragraph 1, every division or successive segregation of land must be submitted to prior municipal scrutiny. If the operation envisaged is a plot division, it must be authorised or refused according to whether or not it complies with the planning rules. Otherwise, the town council declares the plot division licence unnecessary, without prejudice to the division or segregation of land having to conform to the specific conditions of the sectoral legislation.
Article 193. Requirement for executing deeds and registering them in the Land Registry
The execution of deeds and other public documents relating to the operations covered by articles 191 and 192, and the registration of those documents in the Land Registry, must conform to the applicable land legislation and mortgage legislation, and it must be shown that the plot division licence, or the declaration that it is not necessary, has been obtained.
Article 194. Presumption of plot division
A plot division is presumed to exist in any division or successive segregation of land, and also in operations by which undivided shares in land carrying a right of exclusive private use are allotted in ownership or lease, where it is not shown that the prior licence was obtained.
Article 195. Prerequisites for plot division and effects of non-compliance
1. Plot divisions may only be made, and consequently plot division licences may only be granted, if a municipal urban development plan or, where applicable, an urban improvement plan implementing it has first been approved, where urban land is affected, or if the partial urban development plan for the corresponding sector has first been approved, for developable land. On non-developable land plot divisions may not be made in any case.
2. Lots resulting from a plot division carried out in breach of the provisions of this article or of the regime of planning indivisibility of land regulated by article 196 can never be considered building plots (solares), nor may they be built on, without prejudice to the application of the appropriate measures for the protection of planning legality.
Article 196. Indivisibility of plots and properties
1. The following are indivisible:
a) Plots that the corresponding urban planning determines as minimum plots for the constitution of independent properties.
b) Plots whose size is equal to or smaller than the minimum determined in urban planning, unless the resulting lots are acquired by the owners of adjoining land for the purpose of grouping them together and forming a new property.
c) Plots whose size is less than twice the area determined as the minimum in urban planning, unless the excess over that minimum can be segregated for the purpose specified in letter b.
d) Plots that may be built on in a given proportion of volume to their area, when the volume corresponding to the whole area is built or, if building is in a smaller proportion, the remaining part if it is smaller than the minimum plot, with the exceptions indicated in letter c.
e) Properties on non-developable land whose size is less than twice the minimum cultivation or forestry production units defined for each territorial area, subject to the applicability of the exceptions indicated in letters b and c, where appropriate.
2. The indivisibility of properties must be stated in deeds and other public documents of segregation, grouping or transfer of properties, and also in the Land Registry, in accordance with the applicable legislation.
3. In the cases specified in letters b, c and e of paragraph 1, the effectiveness of the segregation operations is conditional on the grouping operations being executed simultaneously or subsequently in a public deed.
Chapter II. Enforcement orders and cases of ruin
Article 197. Legal duties of use, conservation and rehabilitation and enforcement orders
1. The owners of every class of land, constructions and installations must comply with the duties of use, conservation and rehabilitation established by this Law, by the applicable land legislation and by sectoral legislation. These duties include the conservation and rehabilitation of the objective habitability conditions of dwellings.
2. The owners or the administration must bear the cost arising from the duties referred to in paragraph 1, in accordance with the legislation applicable in each case and taking into account any excess over the limit of the owners’ duties where improvements of general interest are sought.
3. Town councils must order, of their own motion or at the request of any interested person, the execution of the works necessary to conserve the conditions referred to in paragraph 1. Enforcement orders must conform to the local government rules, always observing the principle of administrative proportionality and after hearing the persons concerned.
4. Unjustified failure to comply with the enforcement orders referred to in paragraph 3 entitles the administration to adopt any of the following measures of compulsory enforcement:
a) Substitute enforcement at the expense of the obliged person.
b) The imposition of coercive fines, in accordance with article 225.2, which may be repeated until the conservation obligation is fulfilled.
5. Failure to comply with the enforcement order referred to in paragraph 3 also entitles the administration to include the property in the Municipal Register of Unbuilt Plots, for the purposes of article 179 and the related articles.
Article 198. Declaration of a state of ruin
1. If a construction or part of a construction is in a state of ruin, the town council, of its own motion or at the request of any interested person, must declare it, after hearing the owners and the residents, unless a situation of imminent danger prevents this.
2. A construction or part of a construction is declared to be in a state of ruin in the following cases:
a) If the damage entails the need for a genuine reconstruction of the building because it cannot technically be repaired by normal means.
b) If the cost of the repair works necessary to meet the minimum habitability conditions, in the case of dwellings, or similar conditions for other uses, exceeds 50% of the cost of a new construction with characteristics similar to the existing one in terms of size and use.
c) If works essential for the stability of the building and the safety of persons must be carried out which cannot be authorised under the planning rules in force.
3. A declaration of legal ruin affecting a building that is not listed, is not the subject of a listing procedure and is not declared a cultural asset entails for the owners the obligation to rehabilitate or demolish it, at their choice, unless under the provisions of urban planning rehabilitation cannot be authorised, in which case it entails the obligation to demolish. The owners must carry out the rehabilitation or the demolition, as appropriate, within the period set by the town council, and without prejudice to the application of substitute enforcement at the owners’ expense, where appropriate.
4. In the case of a declaration of legal ruin affecting a building that is listed, the subject of a listing procedure or declared a cultural asset, it is for the competent administration to determine the effects of the declaration of ruin, without prejudice to the owners’ obligation to take the urgent and essential measures to keep it in safe condition.
5. If there is urgency and danger in delaying a declaration of legal ruin of a building, the town council or the mayor, under their responsibility, for safety reasons, must order whatever is necessary regarding the habitability of the property and the eviction of its occupants, and also regarding the shoring up or total or partial demolition of the property.
Where this sits
Previous: Land classes, rural land and existing buildings. Next: Enforcement, infringements and penalties. All translated laws: Spanish laws in English.
Related on voixa.es: Personal tax in Catalonia: both halves of the bill; Spain’s 100% property tax for non-EU buyers: what happened.
Nothing here is advice on your own position, and this reading is not the official text. Spain publishes no official English version of this Act; where the wording matters to a decision, read it against the Spanish original published in the BOE.