Building requirements, handover and the agents of construction
Law 38/1999, articles 1 to 16: which works the Building Act covers, the basic requirements every building must meet, the handover of the finished works from builder to developer — the date from which every liability period runs — the Building Book the buyer must receive, and the duties of the developer, designer, builder, site managers, laboratories, suppliers and owners.
Why a buyer reads the first half of this Act
Most of these articles speak to architects and builders, but two of them decide a buyer’s position years later. Article 6 fixes the date of handover — the signed record of acceptance between builder and developer, or the thirtieth day after notice if the developer stays silent — and every period of liability for defects in article 17 starts on that date, not on the date the buyer signs the deed or moves in. Article 7 requires the finished project, the handover record, the list of everyone who took part and the maintenance instructions to be bound into the Building Book and handed to the final users. Without that book a buyer may not know who to sue.
Chapter I. General provisions
Article 1. Purpose
1. The purpose of this Act is to regulate the building process in its essential aspects, establishing the obligations and responsibilities of the agents taking part in that process and the guarantees necessary for its proper conduct, in order to ensure quality through compliance with the basic requirements for buildings and the proper protection of users’ interests.
2. Obligations and responsibilities relating to the prevention of occupational risks in building works shall be governed by their specific legislation.
3. Where public administrations and the bodies and entities subject to public procurement legislation act as agents of the building process, they shall be governed by public procurement legislation and, in matters not covered by it, by the provisions of this Act, except for the provisions on compulsory guarantees.
Article 2. Scope
1. This Act applies to the building process, meaning the action and the result of constructing a permanent building, public or private, whose principal use falls within one of the following groups:
a) Administrative, health, religious, residential in all its forms, educational and cultural.
b) Aeronautical; agricultural and livestock; energy; hydraulic; mining; telecommunications (referring to telecommunications engineering); land, sea, river and air transport; forestry; industrial; naval; sanitation and hygiene engineering; and ancillary to engineering works and their operation.
c) All other buildings whose uses are not expressly listed in the preceding groups.
2. The following works shall be regarded as building for the purposes of this Act and shall require a project as established in article 4:
a) New-build works, except constructions of minor constructive scale and technical simplicity that do not, occasionally or permanently, have a residential or public character and are carried out on a single storey.
b) All interventions on existing buildings, provided they alter their architectural configuration, meaning those that are total interventions or partial ones producing an essential change in the general exterior composition, the volume or the structural system as a whole, or whose purpose is to change the characteristic uses of the building.
c) Works constituting a total intervention in listed buildings or buildings enjoying some form of environmental or historic-artistic protection, regulated by a legal rule or a planning document, and partial works affecting the protected elements or parts.
3. A building is deemed to include its fixed installations and its own equipment, as well as the development elements that remain attached to the building.
Chapter II. Technical and administrative requirements for building
Article 3. Basic requirements for building
1. In order to guarantee the safety of persons, the well-being of society and the protection of the environment, the following basic requirements for building are established, which must be met, in the manner established by regulation, in the project, construction, maintenance, conservation and use of buildings and their installations, and in interventions carried out on existing buildings:
a) Relating to functionality:
a.1) Use, so that the layout and dimensions of the spaces and the installations provided allow the functions envisaged in the building to be properly carried out.
a.2) Accessibility, so that persons with reduced mobility and communication can enter and move around the building on the terms provided in the specific rules.
a.3) Access to telecommunications, audiovisual and information services in accordance with the specific rules.
a.4) Ease of access for postal services, by providing appropriate installations for the delivery of postal items, as provided in the specific rules.
b) Relating to safety:
b.1) Structural safety, so that no damage occurs in the building, or parts of it, that originates in or affects the foundations, supports, beams, floor slabs, load-bearing walls or other structural elements and that directly compromises the mechanical strength and stability of the building.
b.2) Fire safety, so that occupants can leave the building in safe conditions, the spread of fire within the building itself and to adjoining buildings can be limited, and firefighting and rescue teams can act.
b.3) Safety in use, so that normal use of the building does not entail a risk of accident to persons.
c) Relating to habitability:
c.1) Hygiene, health and protection of the environment, so that acceptable conditions of healthiness and watertightness are achieved in the indoor environment of the building and the building does not harm the environment in its immediate surroundings, ensuring proper management of all kinds of waste.
c.2) Protection against noise, so that the noise perceived does not endanger people’s health and allows them to carry out their activities satisfactorily.
c.3) Energy saving and thermal insulation, so as to achieve a rational use of the energy necessary for the proper use of the building.
c.4) Other functional aspects of the constructive elements or installations allowing satisfactory use of the building.
2. The Technical Building Code is the regulatory framework establishing the basic quality requirements for new buildings and their installations, and for interventions on existing buildings as provided in letters b) and c) of article 2.2, so as to allow the above basic requirements to be met.
From the entry into force of this Act, the basic building standards and the other compulsory technical regulations constitute the technical regulation until the Technical Building Code is approved as provided in the second final provision of this Act.
The Code may be supplemented by the requirements of other rules issued by the competent administrations and shall be updated periodically in line with technical developments and the demands of society.
Article 4. Project
1. The project is the set of documents defining and determining the technical requirements of the works referred to in article 2. The project must technically justify the solutions proposed in accordance with the specifications required by the applicable technical rules.
2. Where the project is developed or completed by partial projects or other technical documents on specific technologies or installations of the building, the necessary coordination shall be maintained among all of them without duplication either of the documentation or of the fees to be received by the authors of the various works.
Article 5. Licences and administrative authorisations
The construction of buildings, the execution of works on them and their occupation shall require the mandatory licences and other appropriate administrative authorisations, in accordance with the applicable rules.
Article 6. Handover of the works
1. Handover of the works is the act by which the builder, once the works are completed, delivers them to the developer and the developer accepts them. It may take place with or without reservations and must cover the whole of the works or complete and finished phases of them, where the parties so agree.
2. The handover must be recorded in a record signed at least by the developer and the builder, which shall state:
a) The parties taking part.
b) The date of the final certificate for the whole of the works or for the complete and finished phase of them.
c) The final cost of the material execution of the works.
d) The declaration that the works are accepted with or without reservations, specifying the reservations objectively where there are any, and the period within which the defects observed must be remedied. Once remedied, this shall be recorded in a separate record signed by the signatories of the handover.
e) Any guarantees required of the builder to secure its liabilities.
The final certificate of works signed by the site manager and the construction manager shall also be attached.
3. The developer may refuse handover of the works if it considers that they are not finished or do not conform to the contractual conditions. The refusal must in any event be reasoned in writing in the record, which shall set the new period for handover.
4. Unless expressly agreed otherwise, handover of the works shall take place within thirty days of the date of their completion, evidenced in the final certificate of works, a period counted from the written notification to the developer. Handover shall be deemed to have taken place tacitly if, thirty days after that date, the developer has not stated reservations or a reasoned refusal in writing.
5. The liability and guarantee periods established in this Act shall run from the date on which the handover record is signed, or from when handover is deemed to have taken place tacitly as provided in the preceding paragraph.
Article 7. Documentation of the completed works
Once the works are finished, the project, incorporating any duly approved modifications, shall be provided to the developer by the site manager for the completion of the relevant administrative procedures.
That documentation shall be accompanied by at least the handover record, the list identifying the agents who have taken part in the building process, and the instructions for use and maintenance of the building and its installations, in accordance with the applicable rules.
All the documentation referred to in the preceding paragraphs, which shall constitute the Building Book, shall be delivered to the final users of the building.
Chapter III. Agents of the building process
Article 8. Concept
The agents of the building process are all persons, natural or legal, who take part in the building process. Their obligations shall be determined by this Act, the other applicable provisions and the contract under which they take part.
Article 9. The developer
1. A developer is any person, natural or legal, public or private, who, individually or collectively, decides on, promotes, schedules and finances, with its own or third-party resources, building works for itself or for subsequent transfer, delivery or assignment to third parties under any title.
2. The developer’s obligations are:
a) To hold over the plot a right entitling it to build on it.
b) To provide the prior documentation and information necessary to draw up the project, and to authorise the site manager to make subsequent modifications to it.
c) To apply for and obtain the mandatory licences and administrative authorisations, and to sign the handover record of the works.
d) To take out the insurance provided for in article 19.
e) To deliver to the purchaser, where applicable, the documentation of the completed works, or any other document required by the competent administrations.
Article 10. The designer
1. The designer is the agent who, on the developer’s instructions and subject to the relevant technical and planning rules, draws up the project.
Other technicians may draw up partial projects of the project, or parts complementing it, in coordination with its author.
Where the project is developed or completed by partial projects or other technical documents as provided in article 4.2 of this Act, each designer shall hold title to their own project.
2. The designer’s obligations are:
a) To hold the qualifying academic and professional degree of architect, technical architect, engineer or technical engineer, as appropriate, and to meet the conditions required to practise the profession. In the case of legal persons, to designate the technician drafting the project who holds the qualifying professional degree.
Where the project concerns the construction of buildings for the uses listed in group a) of article 2.1, the qualifying academic and professional degree shall be that of architect.
Where the project concerns the construction of buildings for the uses listed in group b) of article 2.1, the qualifying academic and professional degree shall, as a general rule, be that of engineer, technical engineer or architect, and shall be determined by the legal provisions in force for each profession, in accordance with their respective specialities and specific competences.
Where the project concerns the construction of buildings in group c) of article 2.1, the qualifying academic and professional degree shall be that of architect, technical architect, engineer or technical engineer, and shall be determined by the legal provisions in force for each profession, in accordance with their specialities and specific competences.
The same criteria shall be followed for projects for the works referred to in article 2.2.b) and 2.2.c) of this Act.
In any event and for all groups, in the specific aspects corresponding to their specialities and specific competences, and in particular regarding the complementary elements referred to in article 2.3, other qualified technicians in the field of architecture or engineering may also take part, signing the work they carry out, coordinated by the designer. Such specialised interventions shall be mandatory if the legal provision regulating the sector of activity concerned so establishes.
b) To draw up the project in accordance with the rules in force and with what has been established in the contract, and to deliver it with any mandatory professional stamps (visados).
c) To agree with the developer, where applicable, on the engagement of partial collaborations.
Article 11. The builder
1. The builder is the agent who contractually undertakes to the developer to carry out the works or part of them, with its own or third-party human and material resources, in accordance with the project and the contract.
2. The builder’s obligations are:
a) To carry out the works in accordance with the project, the applicable legislation and the instructions of the site manager and the construction manager, so as to achieve the quality required in the project.
b) To hold the qualification or professional capacity enabling it to meet the conditions required to act as builder.
c) To appoint the site foreman, who shall assume the technical representation of the builder on site and who, by qualification or experience, must have the appropriate capacity for the characteristics and complexity of the works.
d) To assign to the works the human and material resources their importance requires.
e) To formalise subcontracts for certain parts or installations of the works within the limits established in the contract.
f) To sign the setting-out or commencement record and the handover record of the works.
g) To provide the site manager with the data necessary to prepare the documentation of the completed works.
h) To take out the guarantees provided for in article 19.
Article 12. The site manager
1. The site manager (director de obra) is the agent who, as part of the professional site supervision team, directs the progress of the works in their technical, aesthetic, planning and environmental aspects, in accordance with the project defining them, the building licence, the other mandatory authorisations and the conditions of the contract, in order to ensure that they are fit for the intended purpose.
2. Other technicians may direct the works of the partial projects, under the coordination of the site manager.
3. The site manager’s obligations are:
a) To hold the qualifying academic and professional degree of architect, technical architect, engineer or technical engineer, as appropriate, and to meet the conditions required to practise the profession. In the case of legal persons, to designate the technician acting as site manager who holds the qualifying professional degree.
In the case of the construction of buildings for the uses listed in group a) of article 2.1, the qualifying academic and professional degree shall be that of architect.
Where the works concern the construction of the buildings listed in group b) of article 2.1, the qualifying degree shall, as a general rule, be that of engineer, technical engineer or architect, and shall be determined by the legal provisions in force for each profession, in accordance with their specialities and specific competences.
Where the works concern the construction of the buildings listed in group c) of article 2.1, the qualifying degree shall be that of architect, technical architect, engineer or technical engineer, and shall be determined by the legal provisions in force for each profession, in accordance with their specialities and specific competences.
The same criteria shall be followed for the works referred to in article 2.2.b) and 2.2.c) of this Act.
b) To verify the setting-out and the suitability of the planned foundations and structure for the geotechnical characteristics of the ground.
c) To resolve contingencies arising on site and to record in the Book of Orders and Attendance the precise instructions for the correct interpretation of the project.
d) To prepare, at the developer’s request or with its consent, any modifications to the project required by the progress of the works, provided they conform to the rules considered and observed in drawing up the project.
e) To sign the setting-out or commencement record and the final certificate of works, and to approve the interim certificates and the final account of the units of work executed, with any mandatory professional stamps.
f) To prepare and sign the documentation of the completed works for delivery to the developer, with any mandatory professional stamps.
g) Those listed in article 13, in cases where the site manager and the construction manager are the same professional, if that option is chosen, in accordance with article 13.2.a).
Article 13. The construction manager
1. The construction manager (director de la ejecución de la obra) is the agent who, as part of the professional site supervision team, assumes the technical function of directing the material execution of the works and of controlling, qualitatively and quantitatively, the construction and the quality of what is built.
2. The construction manager’s obligations are:
a) To hold the qualifying academic and professional degree and to meet the conditions required to practise the profession. In the case of legal persons, to designate the technician acting as construction manager who holds the qualifying professional degree.
Where the works concern the construction of buildings for the uses listed in group a) of article 2.1, the qualifying academic and professional degree shall be that of technical architect. This shall also be the qualifying degree for works in group b) directed by architects.
In other cases the management of the execution of the works may be carried out, without distinction, by professionals holding the degree of architect, technical architect, engineer or technical engineer.
b) To verify the receipt on site of construction products, ordering the necessary tests and trials.
c) To direct the material execution of the works, checking the setting-out, the materials, and the correct execution and arrangement of the constructive elements and installations, in accordance with the project and the site manager’s instructions.
d) To record the precise instructions in the Book of Orders and Attendance.
e) To sign the setting-out or commencement record and the final certificate of works, and to prepare and sign the interim certificates and the final account of the units of work executed.
f) To collaborate with the other agents in preparing the documentation of the completed works, providing the results of the control carried out.
Article 14. Building quality-control bodies and laboratories
1. Building quality-control bodies are those qualified to provide technical assistance in verifying the quality of the project, the materials and the execution of the works and their installations in accordance with the project and the applicable rules. To carry on their activity throughout Spain it shall be sufficient to file a responsible declaration, stating that they meet the technical requirements laid down by regulation, with the competent body of the Autonomous Community in which they have their registered or professional address.
2. Testing laboratories for building quality control are those qualified to provide technical assistance by carrying out tests or service trials of the materials, systems or installations of a building works. To carry on their activity throughout Spain it shall be sufficient to file, for each of the physical establishments from which they provide their services, a responsible declaration stating that these meet the technical requirements laid down by regulation, with the competent bodies of the relevant Autonomous Community.
3. The obligations of quality-control bodies and laboratories are:
a) To provide technical assistance and deliver the results of their activity to the agent who commissioned it and, in any event, to the person technically responsible for receiving and accepting the results of the assistance, whether the construction manager or the agent concerned in the project phase, the execution of the works and the useful life of the building.
b) To show that they have implemented a quality-management system defining the procedures and test or inspection methods used in their activity, and that they have adequate capacity, staff, means and equipment.
Article 15. Product suppliers
1. Product suppliers are manufacturers, warehouse operators, importers or sellers of construction products.
2. A construction product is one manufactured for permanent incorporation into a works, including materials, semi-finished elements, components and works or parts of them, whether finished or in the course of execution.
3. The supplier’s obligations are:
a) To deliver the products in accordance with the specifications of the order, answering for their origin, identity and quality and for compliance with any requirements laid down by the applicable technical rules.
b) To provide, where appropriate, the instructions for use and maintenance of the products supplied and the corresponding quality guarantees, for inclusion in the documentation of the completed works.
Article 16. Owners and users
1. Owners are obliged to keep the building in good condition through proper use and maintenance, and to receive, keep and pass on the documentation of the completed works and the insurance and guarantees attached to it.
2. Users, whether or not they are owners, are obliged to use the buildings or parts of them properly in accordance with the instructions for use and maintenance contained in the documentation of the completed works.
Where this sits
The next page translates articles 17 to 20 and the provisions that matter to a buyer: the ten-, three- and one-year liability of each agent, the two-year limitation period, the compulsory ten-year insurance that a notary and the Land Registry must see before a new building can be deeded and registered, and the protection of money paid to a developer before completion.
Related on voixa.es: Spain’s 100% property tax for non-EU buyers: what happened; Modelo 210: the non-resident deadlines changed in 2026.
Nothing here is advice on your own position, and this reading is not the official text. Spain publishes no official English version of this Act; where the wording matters to a decision, read it against the Spanish original linked above.