Valencian Law 2/2025, articles 1 to 6: the municipalities to which the measures apply, special urban plans for reconstruction, fast-track amendments of municipal plans on urbanised land, local reconstruction projects for new housing, uses treated as compatible, and the repair and rebuilding of damaged buildings under responsible declarations. The additional, transitional and final provisions amend Decree 8/2016, the TRLOTUP and Law 6/2024, order the revision of PATRICOVA and set the rules for planning procedures on rural land according to the PATRICOVA, SNCZI and DANA flood maps until that revision is approved.

Unofficial English translation from the Spanish by Voixa Consultors S.L. Alexander Baranov is responsible for the translation. Source: Ley 2/2025, de 15 de abril, de medidas urbanísticas urgentes para favorecer las tareas de reconstrucción después de los daños producidos por la dana, consolidated text, last modification 10 August 2026, BOE-A-2025-9743 ↗. Check wording, figures, dates and legal effect against the Spanish original before relying on this reading. Source snapshot: 10 November 2026. This page: articles 1 to 6, first to fifth additional provisions, first and second transitional provisions, and first and second final provisions. This page translates the whole law except the preamble.

Article 1. Purpose and scope of application

1. The purpose of this law is to establish certain urgent planning measures applicable to the municipalities of the Valencian Community affected by the damage caused by the isolated depression at high levels (DANA).

2. These measures shall apply to the municipalities of the Valencian Community included in the annex to Royal Decree-law 6/2024 of 5 November, adopting urgent measures in response to the damage caused by the isolated depression at high levels (DANA) in various municipalities between 28 October and 4 November 2024.

Likewise, these measures shall apply to the municipalities of the Valencian Community included in Decree 164/2024 of 4 November of the Consell, approving the regulatory bases and the procedure for the direct award of urgent aid to the municipalities affected by the damage caused by the storm of wind and rain that began in the Valencian Community on 29 October 2024, and its amendments.

Article 2. Special urban plan for reconstruction

In the municipalities affected by the DANA, the Generalitat, the town councils affected or interested persons may promote special urban plans for reconstruction aimed at creating and zoning finished building land (suelos finalistas) for the construction of dwellings, at relocating industrial or tertiary estates, at integrating the infrastructure that proves necessary and, in general, at facilitating the reconstruction work.

The Generalitat shall be competent to process the plan.

These special plans may amend the provisions of general and territorial planning and may affect land included in one or several municipalities, and their area may be discontinuous. These plans may relate to land in the basic urbanised situation and land in the basic rural situation.

2. The special urban plan for reconstruction shall contain all the planning provisions necessary to allow its immediate execution. Depending on the circumstances, the planning standards provided for in planning legislation may be reduced, with justification and stated reasons.

3. The documentation of the special urban plan for reconstruction shall be exclusively the following:

a) Information and justification report, which shall include a justification of the planned financing.

b) Information and zoning plans (drawings).

c) Planning rules.

d) The environmental documentation that may be necessary.

4. The procedure for approving the plan shall be that provided for in the consolidated text of the Law on territorial planning, urban planning and landscape, approved by Legislative Decree 1/2021 of 18 June (TRLOTUP), with the following special features:

a) The processing of the file shall have preferential and urgent status in all the regional and local departments that must take part during the procedure for drawing up and approving the plan.

b) The maximum time limits for processing in the environmental assessment process shall be the following:

i. The time limit for the consultation stage shall be twenty working days.

ii. The maximum time limit from receipt of the application to initiate environmental assessment until the issue of the scoping document or of the strategic environmental and territorial report shall be two months.

iii. Where the plan is processed under the ordinary environmental procedure, the maximum time limit for formulating the strategic environmental statement shall be three months.

c) The time limit for issuing regional and local sectoral reports shall be ten working days, including a mandatory and non-binding report of the Second Vice-Presidency and Regional Ministry for the Economic and Social Recovery of the Valencian Community. As regards the reports to be issued by the General State Administration, the mechanisms that may be established in accordance with article 39 of Royal Decree-law 7/2024 of 11 November, adopting urgent measures to boost the Plan for immediate response, reconstruction and relaunch in response to the damage caused by the DANA in various municipalities between 28 October and 4 November 2024, shall apply.

d) Final approval of the plan shall be the responsibility of the Consell or of the body to which it delegates.

5. The body of the regional administration that decides to draw up a special urban plan for reconstruction may resolve on urgent or emergency processing of the contract for drafting the corresponding technical documentation of the plan, on the terms established in the legislation on public sector contracts.

6. In the execution of the provisions of the special urban plan for reconstruction, the following special features shall apply:

a) The plan shall preferably be executed by direct management through the expropriation system, unless there are circumstances justifying its management through other systems provided for in the TRLOTUP.

Where expropriation is used, the status of beneficiary of the expropriation may be granted to a public body or public company responsible for its management.

b) The processing of the management procedures shall have preferential and urgent status.

c) Where necessary, the programme may be processed simultaneously with the special plan.

Article 3. Amendments of municipal planning on land in the basic urbanised situation

1. In the municipalities affected by the DANA, amendments of municipal urban planning on land in the basic urbanised situation aimed at facilitating the reconstruction work shall in all cases be regarded as amendments of the detailed zoning (ordenación pormenorizada). Accordingly, the environmental body and the substantive body for these amendments shall be the town council.

2. The time limits for processing these amendments shall be halved, their processing shall have preference and the documentation required shall be that strictly necessary to achieve their purposes.

Article 4. Local reconstruction projects

1. Exceptionally, the town councils of the municipalities affected by the DANA may approve local reconstruction projects (PRL) by resolution of the Plenary adopted by absolute majority.

PRLs shall be regarded as works and service projects for the purposes of article 81.2.a) of Law 7/1985 regulating the bases of the local government regime, so that their approval shall entail the automatic change of the legal classification of the plots affected, which shall come to be regarded as patrimonial property (bienes patrimoniales).

2. The purpose of PRLs shall be the establishment of newly built residential dwellings on vacant, undeveloped building plots zoned as facilities in accordance with the definition established in annex IV, section I.2.1.c), of the TRLOTUP. Vacant building plots belonging to the municipal land assets or others of a merely patrimonial nature may also be the subject of a PRL.

3. The persons to whom the dwellings included in PRLs are allocated, by purchase or under a rental regime, shall preferably be persons who lost their dwelling because of the DANA. The dwellings shall be allocated subject to the objective conditions that the acting administration establishes for each case.

4. Town councils may enter into agreements with other administrations for the development and execution of PRLs.

5. The processing and approval of PRLs shall require a technical and legal report. Their documentary content shall include: a building project, as regards its execution; where applicable, an ordinary works project to complete the urban services of the building plots; and a study of integration into the surroundings in order to determine the planning parameters applicable to the PRL.

The study of integration into the surroundings of PRLs shall define the buildable area applicable to them by means of the homogeneous areas technique.

The other planning parameters shall be set according to the typology and characteristics of the building project. In all cases the provisions of PATRICOVA shall be respected.

6. The Generalitat may, through the regional ministry responsible for urban planning, process and approve local reconstruction projects, in which case it shall be the acting administration. Approval of a PRL shall entail a declaration of general interest, and it shall not be necessary to obtain a municipal licence, in accordance with article 243.2 of the TRLOTUP. The planning parameters of the action shall be fixed on approval of the PRL, in accordance with the rules established in the previous paragraph of this article, and the procedure established in article 243.2 of the TRLOTUP shall not apply. The execution of the projects, as well as the allocation of the resulting dwellings, may be carried out directly by the regional ministry responsible for housing or through the Valencian Housing and Land Entity (Entidad Valenciana de Vivienda y Suelo).

7. For PRLs carried out on land for facilities, the town council shall, within three years of their approval, promote one or more planning amendments whose purpose is to obtain land to replace the facility occupied, thereby restoring the balance between public facilities and profitable development rights (aprovechamiento lucrativo) referred to in article 67.3 of the TRLOTUP.

Article 5. Special rules on planning compatibility

1. Actions promoted by the various public administrations on non-developable land aimed at mitigating the damage caused by the DANA shall be regarded as a compatible planning use. In particular, the hydraulic works necessary to increase the capacity to evacuate flows or to attenuate them shall be regarded as compatible, regardless of the zoning of the land affected and of its specific planning regime. Approval of these projects shall mean their incorporation into the planning in force.

In the municipalities not included in article 1.2 of this rule, actions promoted by the various public administrations, such as the storage of vehicles or of waste and similar actions whose reason for existence is the damage caused by the DANA, shall be regarded as a compatible planning use.

2. On urban or developable land in the municipalities affected by the DANA, any use or installation necessary to mitigate the damage caused by the flooding may be established provisionally. In those areas, and for the same purpose, without the need to amend the planning, the public facility use initially provided for may be replaced by another public facility use, a resolution of the plenary of the town council being sufficient, with the prior agreement of the sectoral administrations affected.

Article 6. Special rules on the repair, restoration or reconstruction of buildings

1. On land in the basic urbanised situation, lawfully established buildings and constructions damaged by the DANA may be repaired, restored or rebuilt, even with structural alterations, even if they are in a non-conforming situation (fuera de ordenación) under municipal urban planning and exceed what is provided for in its transitional regime.

Where the non-conforming situation entails the occupation of land zoned in the plan as roads or public space, the town council may require the reconstruction to conform to the new alignments.

The provisions of this point are without prejudice to the town council being able to process planning amendments in accordance with article 3 of this law, in which case the reconstruction shall conform to what is established in their provisions.

2. New building, construction and installation works shall be subject to the regime of responsible declaration with a certificate of conformity from a planning collaborating entity (ECUV). Interventions on buildings, properties and areas that are protected or listed as heritage, and that have heritage significance in accordance with the legislation on the protection of cultural heritage, shall be subject to the same regime.

3. All other works shall be subject to the regime of responsible declaration.

4. If, for the works regulated in this article, temporary occupation of public-domain land or airspace is necessary for the installation of scaffolding or temporary auxiliary installations, until the works are completed, that occupation shall likewise be subject to responsible declaration.

5. Where the building has to be completely rebuilt, the conditions for the adaptation of buildings and urbanisation established in annex I to Decree 201/2015 of 29 October of the Consell, approving the Territorial action plan on the prevention of flood risk in the Valencian Community (PATRICOVA), shall apply to it.

Where the building is not completely rebuilt, the project shall examine the application of measures to reduce the vulnerability of the building to flood risk.

6. In no case shall it be permitted to restore or rebuild illegal buildings in respect of which the time limit for exercising the power to restore planning legality has expired, in accordance with article 256 of the TRLOTUP.

First additional provision. Amendment of paragraph 12 of article 3 and addition of a paragraph 13 and a paragraph 14 to the same article of the Regulation on territorial and planning bodies of the Generalitat, approved by Decree 8/2016 of 5 February of the Consell

Paragraph 12 of article 3 is amended and a paragraph 13 and a paragraph 14 are added to the same article of the Regulation on territorial and planning bodies of the Generalitat approved by Decree 8/2016 of 5 February of the Consell, which are worded as follows:

«Article 3. Powers reserved to the regional minister (conseller or consellera).

[…]

12. To resolve the discrepancies arising between the substantive body and the environmental body in the processing of planning instruments, for the purposes of article 12 of Law 21/2013 of 9 December on environmental assessment.

13. To approve by resolution the official maps of the regional ministry.

14. The regional minister shall likewise hold the other territorial planning and urban planning powers of the Generalitat conferred by law, as well as those not expressly conferred on other bodies by the legislation in force or by this regulation.»

Second additional provision. Revision of PATRICOVA

Within a maximum of one year, the revision of the Territorial action plan of a sectoral nature on the prevention of flood risk in the Valencian Community, PATRICOVA, shall be drawn up and approved in the area of the municipalities affected by the floods of 29 October 2024. This revision shall analyse the current flood risk situation of the territory, taking into account the effects of those floods. In addition, that revision shall set out the hydraulic works within the competence of the General State Administration necessary to minimise the level of risk of the affected area.

Third additional provision. Amendment of paragraph 2 of article 55, letter c) of paragraph 1 of article 194 and letter a) of paragraph 4 of article 196 of the consolidated text of the Law on territorial planning, urban planning and landscape, approved by Legislative Decree 1/2021 of 18 June of the Consell

Paragraph 2 of article 55, letter c) of paragraph 1 of article 194 and letter a) of paragraph 4 of article 196 of the consolidated text of the Law on territorial planning, urban planning and landscape, approved by Legislative Decree 1/2021 of 18 June of the Consell, are amended and worded as follows:

«Article 55. Public participation and reports.

[…]

2. The public information on the plan shall be given by means of notices published in the Diari Oficial de la Generalitat Valenciana and on the website of the promoting administration. The notices shall indicate the electronic address at which all the documentation making up the plan may be consulted. The public information period shall be 45 working days, during which objections may be submitted.

[…]

Article 194. Declaration of non-compliance and compulsory building regime.

1. Where the time limits for building referred to in article 188 of this consolidated text have been exceeded, the town council shall issue an individual order to build or rehabilitate in the areas of action referred to in that article, in accordance with the following procedure:

[…]

c) The order shall be submitted to public information for a period of one month, announced in the Diari Oficial de la Generalitat Valenciana and on the website of the promoting administration, and shall be expressly notified, simultaneously or beforehand, to the owners and to the holders of rights in rem, granting them a period of two months so that:

[…]

Article 196. Programme for an isolated action in substitution of the owner.

[…]

4. The competition for the approval of the programme for an isolated action and the selection of the awardee by compulsory substitution shall consist of two phases:

a) A first phase, lasting two months, for the submission of technical alternatives in an open envelope (plica abierta) by any private persons who so wish; all those submitted shall remain on public display for a minimum period of one month from the end of the previous period, by means of a notice in the Diari Oficial de la Generalitat Valenciana and on the website of the promoting administration. Once that period has elapsed, within a maximum of a further two months, after the issue of such municipal technical reports as are considered necessary, the town council shall select a technical alternative, with justification based on the factors established in the specifications that concerned the technical alternative.

[…]»

Fourth additional provision. Amendment of paragraph 3 of the third transitional provision of Law 6/2024 of 5 December of the Generalitat on administrative simplification

Paragraph 3 of the third transitional provision of Law 6/2024 of 5 December of the Generalitat on administrative simplification is amended and worded as follows:

«Third transitional provision. Transitional regime for strategic investment projects and strategic territorial projects.

[…]

3. Sustainable strategic investment projects or strategic territorial projects that began processing under articles 17 and 63 to 66 and the ninth additional provision in force before the entry into force of Decree-law 7/2024 of 9 July of the Consell, and that had already passed the public consultation stage referred to in article 51 of Legislative Decree 1/2021, approving the consolidated text of the Law on territorial planning, urban planning and landscape of the Valencian Community, as well as those that had not been submitted to the public consultation stage but whose promoter does not request that they be processed in accordance with the decree-law from which this law originates, shall continue to be processed and governed for all purposes by the rules prior to this law, except for the stage provided for in the second subparagraph of paragraph 2 of article 63 of the previous consolidated text of the Law on territorial planning, urban planning and landscape.»

Fifth additional provision. Amendment of the title and of letter b) of paragraph 2 of the twenty-fourth transitional provision of the consolidated text of the Law on territorial planning, urban planning and landscape, approved by Legislative Decree 1/2021 of 18 June

The title and letter b of paragraph 2 of the twenty-fourth transitional provision of the consolidated text of the Law on territorial planning, urban planning and landscape, approved by Legislative Decree 1/2021 of 18 June, are amended and worded as follows:

«Twenty-fourth transitional provision. Regularisation of industrial and tertiary activities on non-developable land.

[…]

2. When these DICs (declarations of community interest) are granted, exemption may be given from compliance with:

[…]

b) That the type of activity carried on is one of those provided for in points 1st, 2nd and 3rd of letter e) of article 211.1; and that the type of activity carried on is one of those provided for in points 1st to 8th of letter f) of article 211.1.

[…]»

First transitional provision. Retroactive effect of the measures included in article 5

The provisions of article 5 of this law shall have effect from 29 October 2024.

Second transitional provision. Processing of planning procedures until the revision of PATRICOVA

Until the revision of PATRICOVA referred to in the second additional provision of this rule is approved, the following rules shall apply in the processing of planning procedures:

1. Urban planning instruments affecting land in the basic rural situation that appears as not flood-prone in the maps of the Territorial action plan of a sectoral nature on the prevention of flood risk in the Valencian Community (PATRICOVA maps) and in the maps of the National Flood Zone Mapping System (SNCZI maps), and as not flooded in the DANA 2024 maps of the Generalitat’s map viewer (DANA maps), may continue their ordinary processing and, where appropriate, be approved in accordance with the planning rules in force. The same regime shall apply to declarations of community interest (DIC) applied for on this type of land.

2. Urban planning instruments affecting land in the basic rural situation that appears as flood-prone in the PATRICOVA maps and/or in the SNCZI maps, but not flooded in the DANA maps, may continue their ordinary processing and, where appropriate, be approved in accordance with the planning rules in force. These instruments shall comply with the limitations deriving from PATRICOVA and from the Regulation on the public water domain, or the rule replacing it. The same regime shall apply to declarations of community interest (DIC) applied for on this type of land.

3. Urban planning instruments affecting land in the basic rural situation that appears as flood-prone in the PATRICOVA maps and/or in the SNCZI maps, and also as flooded in the DANA maps, may continue their ordinary processing and, where appropriate, be approved in accordance with the planning rules in force. These instruments shall comply with the limitations deriving from PATRICOVA and from the Regulation on the public water domain, or the rule replacing it. The report of the regional body competent to assess flood risk that evaluates the limitations deriving from PATRICOVA and from the Regulation on the public water domain shall, in addition, include a section on the studies necessary to assess the risk and/or the preventive measures to be applied in respect of the reality described by the DANA maps. The same regime shall apply to declarations of community interest (DIC) applied for on this type of land.

4. Urban planning instruments affecting land in the basic rural situation that appears as not flood-prone in the PATRICOVA maps and in the SNCZI maps, but as flooded in the DANA maps, may continue their ordinary processing and, where appropriate, be approved in accordance with the planning rules in force. These instruments may only be authorised following a favourable report of the regional body competent to assess flood risk, indicating the studies necessary to assess the risk and/or the preventive measures to be applied. The same regime shall apply to declarations of community interest (DIC) and to licences applied for on this type of land.

5. Where the actions provided for in paragraphs 2, 3 and 4 are affected by hydraulic works within the competence of the General State Administration that are scheduled and not carried out, the regional ministry responsible for urban planning may make their execution conditional on the simultaneous carrying out of those works.

6. Planning instruments being processed shall adapt their regulation of land uses to the latest information available on flood risk. Accordingly, for plans and DICs that already have a sectoral report on flood risk issued before 29 October 2024, the promoting body shall prepare an addendum analysing the new information obtained from the DANA maps and any additional measures that need to be adopted in the light of it. That addendum shall be forwarded to the regional body competent to assess flood risk for evaluation and the issue of a new report. The measures proposed in that body’s report shall be mandatory for the approval and execution of those instruments.

Four cases. The second transitional provision sorts rural land by the three flood maps: land not flooded in the DANA maps continues ordinary processing, subject to the PATRICOVA and public water domain limits where PATRICOVA or SNCZI shows it as flood-prone (paragraphs 1 and 2); land flooded in the DANA maps needs a flood-risk report on studies and preventive measures, which must be favourable where neither PATRICOVA nor SNCZI shows it as flood-prone (paragraphs 3 and 4).

First final provision. Rank of the amended regulatory provision

Decree 8/2016 of 5 February of the Consell, approving the Regulation on territorial and planning bodies of the Generalitat, which is amended by this law, retains its previous rank and regulatory nature, which means that it may be amended or repealed by a later rule of equal or higher rank.

Second final provision. Entry into force

This law shall enter into force on the day of its publication in the Diari Oficial de la Generalitat Valenciana.

Therefore, I order all citizens, courts, authorities and public powers to whom it applies to observe and enforce this law.

Valencia, 15 April 2025. The President of the Generalitat, Carlos Mazón Guixot.

Related information printed at the end of the consolidated text: bear in mind that this Law results from the processing as a bill of Decree-law 20/2024 of 30 December (Ref. DOGV-r-2025-90002). The consolidated text adds that the document is for information only and has no legal value.

Where this sits

Related: Valencian planning law: licences, illegal builds and rural plots. All translated laws: Spanish laws in English.

Related on voixa.es: Valencia: highest income tax, lowest wealth tax; Spain’s 100% property tax for non-EU buyers: what happened.

Nothing here is advice on your own position, and this reading is not the official text. Spain publishes no official English version of this Act; where the wording matters to a decision, read it against the Spanish original published in the BOE.