LISTA Regulation: utilities, the Land Registry and AFO buildings
Decree 550/2022, the General Regulation of the Andalusian Law 7/2021 (LISTA), articles 312 to 314 and 404 to 410: what utility companies and sellers of prefabricated homes must ask for before contracting, the site board and advertising of works, and deeds and registration of buildings. Then the regime of completed irregular buildings treated as non-conforming (AFO): the requirements, the technical documentation, minimum safety and health conditions, the procedure, the resolution and its effects.
Title VI (continued). Building activity
Chapter II (continued). Means of administrative intervention in building activity
Section 5. Measures guaranteeing and publicising compliance with territorial and urban planning
Article 312. Requirements for access to the services provided by utility companies and for the installation of prefabricated buildings
1. Electricity, water, gas and telecommunications utility companies shall require, for the provisional contracting of the respective services, proof of the works licence or execution order or authorisation that incorporates the municipal preventive control, or of the submission to the municipality of the responsible declaration or notification where applicable, setting as the maximum term of the contract the period established in the enabling means of intervention for completion of the works. Once that period has elapsed the service may not continue to be provided, unless it is shown that notice of the extension of the period for starting or completing the works has been submitted to the competent Administration, with a licence or responsible declaration in force.
2. The utility companies referred to in paragraph 1 shall require, for the definitive contracting of the respective services, the occupation or use licence, responsible declaration or notification, in the cases where it is applicable under the Law or sectoral rules, accompanied by the corresponding certificate signed by a competent technician as provided in article 293.3. The same effect shall be produced by the administrative resolution declaring the legal non-conforming situation (situación legal de fuera de ordenación) or the situation treated as non-conforming (asimilado a fuera de ordenación), or by the administrative certificate of the regime applicable to buildings completed before the entry into force of Law 19/1975 of 2 May, and to those for which the period for adopting measures to restore planning legality had elapsed at the entry into force of Law 8/1990 of 25 July on the Reform of the Planning Regime and Land Valuations.
3. For the purposes of this article, utility companies means both the distribution companies or operators of the respective services or supplies and the retailers or providers of those services or supplies, where they are different from the former, whatever name the relevant sectoral rules may give them.
4. The licence for provisional uses and works shall enable the temporary contracting of the supplies referred to in the preceding paragraphs for their duration and on the terms indicated in the enabling means of intervention. Those supplies must in any event cease when the Town Council so resolves, and it shall forward that resolution to the utility companies.
5. The companies or entities referred to in paragraph 1 of this article shall require and keep, for the provisional contracting of the respective services, a copy of the works licence or execution order, proof of the deemed (tacit) act, or authorisation that incorporates the municipal preventive control, or of the submission of the responsible declaration to the municipality. They shall likewise require from the contracting parties, and keep, for the definitive contracting of the respective services, a copy of the occupation or use licence of the buildings and installations subject to obtaining one, proof of the deemed act or, where applicable, of the responsible declaration.
6. Orders to suspend or cut off supplies of electricity, water, gas or any other energy product or service and of telecommunications adopted within the procedure for restoring territorial or planning legality shall be forwarded to the corresponding distribution companies or operators of the respective services or supplies so that they interrupt the provision of those services. The provisions of this paragraph are without prejudice to the cooperation that the retailers or providers of the services or supplies must provide.
7. Works licences and occupation or use licences, and the other means of intervention that, as provided in the Law and the Regulation, expressly allow the services to be contracted with utility companies, may not be replaced by any other administrative act or resolution or by any other private statement.
8. For the purposes of contracting the supplies referred to in the preceding paragraphs, municipal resolutions authorising or approving acts of construction, building, installation and use of the land, airspace and subsoil promoted by Town Councils within their municipal area shall produce the same effects as the works licence or the occupation and use licence. The same effect is attributed to the corresponding resolutions or authorisations for actions which, as indicated in the Regulation, are not subject to a planning licence, in accordance with their governing rules.
9. Utility companies shall allow supplies to be contracted during the execution of the urbanisation works in groups of irregular buildings included as urban transformation actions on rural land, for those buildings that show authorisation for their provisional use until the total or partial acceptance of the remaining urbanisation works.
10. Companies that sell or install prefabricated buildings capable of housing a residential use, whose installation is subject to a licence or responsible declaration, shall require, for their installation, sale, rental or assignment of use, proof that the licence was obtained beforehand or that the responsible declaration was submitted to the Town Council, and must keep a copy for a period of six years from the date of the legal act.
Article 313. Information and advertising on works
1. An information board showing the enabling title or prerequisite for the action must be displayed at the site of the works.
The board shall consist of a panel of appropriate material and shall include the following information:
a) Location of the works.
b) Developer (promotor) of the works.
c) Descriptive name of the works with reference, where applicable, to the number of dwellings and premises.
d) Owners of the plot or land.
e) Construction company, author of the project, site management team and health and safety coordinator.
f) File number, date of the licence, execution order or responsible declaration or, in the case of public works exempt from a planning licence, of the resolution approving the corresponding project.
g) Planning instrument being executed.
h) Start and completion dates of the works.
The developer is responsible for complying with this obligation and for the information being truthful and up to date.
2. The information board must be placed at the access to the works, in a place visible from the public road and without risk to road safety or to third parties. Boards shall be installed on the temporary enclosures along the plot alignment of sites under works and not in use, or on the hoardings of building works, without projecting more than ten centimetres from their plane.
3. In all cases, a copy of the municipal licence or execution order or, where applicable, of the responsible declaration, and a copy of the technical documentation or project covering the works, must be kept at the place where the works are carried out.
4. The boards shall show the information required by the relevant sectoral rules and, on works financed with public funds, they shall also state the amount of the works budget and the Public Administrations taking part in the case of co-financing.
5. Subject to the preceding paragraphs, the form, dimensions and other characteristics of the information board may be regulated by municipal Ordinances according to the size and characteristics of the works concerned. The requirements applicable under the rules on the protection of historical heritage must also be respected.
6. Once the works are completed, the information and its supports must be removed, restoring, where applicable, the physical reality altered by the placing of the information; the developer is responsible for complying with these obligations.
Prior compliance with the preceding subparagraph shall be a prerequisite for submitting the responsible declaration of occupation or use or, where applicable, for granting the occupation or use licence of the property subject to administrative intervention, and the relevant execution orders shall be adopted where appropriate.
In the event of non-compliance with the first subparagraph, those actions shall be carried out in substitution by the relevant municipal services, and the Town Council may pass on the resulting costs to the developer by any of the legally established means. All of this is without prejudice to any liability that may be enforced.
7. Advertising of works and, in general, of any act and use of land, by any means, including the internet and other technological means, may not contain any statement that does not conform to territorial and urban planning, nor be capable of misleading purchasers as to the other planning conditions of the works, acts or uses of land, and must obligatorily include the burdens arising from urban planning and the requirements and conditions to which approval of the said planning instruments is subject.
8. Urban transformation actions and the planning actions provided for in article 24 of the Law must be publicised by means of an information board, which shall be placed for this purpose in a prominent position on the land concerned. That board shall state:
a) The date of final approval of the territorial instrument or urban planning instruments that legitimise them.
b) The body that approved them.
c) And that the said planning instruments and the projects that develop them are deposited with the corresponding Town Council for public consultation.
Advertising of new urban developments by any other system of dissemination or distribution must include the data indicated above.
Article 314. Requirements for the formalisation and registration of building acts
1. To authorise deeds declaring new construction in progress and completed new construction (escrituras de declaración de obra nueva), in addition to meeting the requirements laid down by the applicable rules, the basic State legislation shall apply.
2. In the case of constructions, buildings and installations in respect of which it is not possible to adopt measures to protect territorial and planning legality or to restore the disturbed legal order because the period for exercising them has elapsed, the completion of the works shall be recorded in the Land Registry in the form and with the effects laid down in State legislation.
Title VIII. Measures for the environmental and territorial adaptation of irregular buildings
Chapter I. Regime of irregular buildings in the situation treated as non-conforming
Article 404. Situation treated as non-conforming
1. Completed irregular buildings, on any class of land and whatever the use to which they are put, in respect of which it is not possible to adopt measures to protect territorial and planning legality because the period for exercising them has elapsed, in accordance with article 153.1 of the Law, are in the situation treated as non-conforming (asimilado a fuera de ordenación, AFO).
2. For these purposes, an irregular building is any construction, work, infrastructure or installation carried out without the required enabling planning title or which, having one, was carried out in breach of its conditions. Whether works are completed shall be determined in accordance with article 355.
3. Irregular buildings may be placed in the situation treated as non-conforming, to the extent that they contravene territorial or planning legality, in cases where it is materially impossible to execute the resolution ordering restoration of the altered physical reality, provided that any compensation by equivalent that may have been set has been paid in full, in accordance with the Regulation.
Without prejudice to court decisions that may be issued in the enforcement of judgments, buildings carried out under a licence or enabling title that has been declared null may also be placed in this situation once the period for adopting measures to protect territorial and planning legality, counted from the date of their completion, has elapsed.
4. Irregular buildings may not have access to basic services, nor may any works be carried out on them, until the administrative resolution recognising the situation treated as non-conforming has been issued.
These limitations shall be expressly mentioned in the resolutions which, as provided in State land legislation, are intended to record in the Land Registry the specific planning situation of completed irregular buildings where those buildings do not have the resolution recognising the situation treated as non-conforming.
5. The handling and resolution of the procedure for recognising the situation treated as non-conforming is the responsibility of the Town Council, which may develop it by ordinance in accordance with the particularities regulated in this Regulation.
6. The situation treated as non-conforming may be recognised for a part of the building in which irregular works have been carried out, provided that it constitutes an independent functional and constructional unit and the requirements of article 405 are met for it.
Article 405. Requirements for recognition
Recognition of an irregular building in the situation treated as non-conforming requires the following conditions to be met:
a) That the period for adopting measures to protect territorial and planning legality has elapsed, in accordance with article 153.1 of the Law.
b) That it meets the minimum safety and health conditions required for habitability or for the use to which it is put, in accordance with the municipal rules or, failing these, in accordance with article 407.
c) That it is not located on land affected by natural processes or human activities that generate real risks of erosion, landslides, subsidence, flooding or other natural, technological or other risks, unless the measures required by the competent Administration to avoid those risks have previously been adopted.
Article 406. Technical documentation proving the requirements
The application for recognition of the situation treated as non-conforming shall be accompanied by a document prepared by a competent technician that makes it possible to verify compliance with the requirements of article 405, which shall include the following:
a) Identification of the building. Cadastral and land registry data of the property or, failing these, its location on official georeferenced cartography.
b) Land regime. Class and category of the land under the planning instrument in force and, where applicable, under the one in force at the time the building was completed.
c) Identification of the existence of risks of natural or human origin.
d) Characteristics of the building. Built floor area, number of storeys, building type, basic construction characteristics and the use to which it is put.
e) Date of completion of the building. Proven by any of the forms of evidence admitted in law.
f) Certificate proving that the building meets the minimum safety and health conditions required for habitability or for the use to which it is put, in accordance with article 407.
g) Where the building is located in an urban subdivision (parcelación urbanística), a description of the plot, for the purposes of article 174.2 of the Law, which may be given by a certificate issued by the Town Council or by a competent technician, a notarial record or a descriptive and graphic cadastral certificate.
h) For the purposes of article 409.1.f, the criminal proceedings and the sectoral penalty or legality-protection proceedings that may affect the building shall be identified. If none are known, a responsible declaration by the holder of the building stating this circumstance shall be attached to the documentation indicated in the preceding paragraphs.
Article 407. Minimum safety and health conditions
1. In the absence of municipal rules, a completed irregular building shall be deemed to meet the minimum safety and health conditions when it has:
a) The necessary structural safety conditions, without being affected by defects that endanger its occupants or third parties or have repercussions on the adjoining properties.
b) The watertightness and insulation conditions necessary to prevent the presence of water and damp that may affect people’s health.
c) A water supply and electricity supply system that makes possible the minimum provision required according to the use to which it is put; the installations making up these systems must comply with the applicable rules.
Where the water supply system is self-sufficient, by means of wells, cisterns, ponds or other authorised means, these must meet the conditions required by the applicable rules. In all cases, the fitness of the water for human consumption must be guaranteed.
d) A waste water disposal system in good working order, together with a treatment system with the technical guarantees necessary to prevent contamination of the ground and of groundwater or surface water.
Where the sanitation system is self-sufficient, it must be type-approved and have the corresponding maintenance contracts.
2. Buildings intended for residential use must, in addition, meet the following requirements:
a) The building must include at least one room serving as living and resting space, kitchen equipment and a separate toilet room.
b) Habitable rooms may not be located in a basement and must have natural lighting and ventilation from an open outdoor space or light well, except toilet rooms and ancillary rooms.
Article 408. Initiation and handling of the procedure
1. The procedure may be initiated ex officio or at the request of the interested parties, accompanying the application with the technical documentation laid down in article 406.
2. While handling the procedure, the Town Council shall request a report from the administrative bodies and entities managing the public interests affected so that they may give their view on, among other circumstances, the following:
a) Effect on public domain land and its zones of influence, and the regime applicable to the irregular building under the sectoral legislation governing them.
b) Handling of penalty or legality-restoration proceedings within their competence.
c) Existence of natural or human-made risks whose assessment is their responsibility.
3. If the building could affect land in the maritime-terrestrial public domain or its easement zones, a report shall be requested from the Administration competent for coasts and, where it affects territorial planning in accordance with article 158.1 of the Law, from the Regional Ministry (Consejería) competent for territorial planning, so that it may state whether there are territorial discipline files.
4. In the light of the technical documentation, the reports issued and the records held by the Town Council on the irregular building, the technical and legal services shall issue a report on the suitability of that documentation, on compliance with the requirements for recognition of the situation treated as non-conforming and, where applicable, on the works necessary to meet those requirements and on their execution in accordance with paragraph 6.
5. While handling the procedure, the owner of the building may be ordered to carry out works enabling the requirements of article 407 to be met, with a period being set for submitting the technical project, where one is required, and for completing the works. The procedure shall be suspended during that period.
The execution of the works must be proven by the interested parties before the resolution of the procedure is issued, and they may consist of the following:
a) Works necessary to guarantee the minimum safety and health conditions of the building, and any other works which, for reasons of general interest, are indispensable to maintain public decorum and to reduce the impact of the building on the surrounding landscape.
b) Works required by the competent Administrations to avoid natural or human-made risks, according to the content of the reports in the file, where their execution falls to the owners of the irregular buildings or is assumed by them.
Article 409. Resolution of the procedure
1. The resolution recognising the situation treated as non-conforming must expressly state the legal regime applicable to this type of building, setting out the conditions to which it is subject and, specifically:
a) The identification of the building and, where applicable, the part of it affected by the resolution.
b) Recognition that the period for adopting measures to protect territorial and planning legality has elapsed.
c) Recognition that the building meets the minimum safety and health conditions required for its habitability or use.
d) Recognition that the building is not located on land affected by natural processes or human activities that generate risks and, where applicable, proof that the measures to avoid them have been adopted as provided in article 408.5.
e) The basic and telecommunications services that may be provided by the utility companies and the conditions of supply, in accordance with article 410.5.
f) Express indication of any criminal proceedings, and of sectoral penalty or legality-protection proceedings, being conducted that may affect the building.
g) Express reference to the applicable regime in accordance with article 410.
2. If the resolution refuses recognition, it shall state the grounds for refusal with an express warning of the regime applicable to the building.
3. The maximum period for resolving shall be six months. Once this period has elapsed without an express resolution, the application shall be deemed rejected by administrative silence. If the procedure was initiated ex officio, it shall lapse.
Article 410. Effects of the declaration treating a building as non-conforming
1. The declaration treating an irregular building as non-conforming is a regulated (non-discretionary) act which does not entail its legalisation, nor does it produce effects on any other administrative proceedings or court decisions to which the action carried out in breach of the legal order may have given rise. The administrative act must be issued without prejudice to the judicial power to judge and to enforce judgments.
2. In the case of urban subdivisions on any class of land, the declaration assimilating the building to the non-conforming regime shall cover the building and the plot on which it stands, whose area, where there are two or more buildings on the same registered plot or, failing that, cadastral plot, shall coincide with the existing boundaries; these particulars must be stated in the declaration treating the building as non-conforming.
This regime shall also apply to plots on which there are irregular buildings for which the time limit of article 153.1 of the Law has elapsed and which are located on subdivisions whose enabling title has been declared null, without prejudice to any court decisions issued in the enforcement of judgments.
On rural land, that declaration shall have the effects of the planning licence required by article 25.1.b) of Law 19/1995 of 4 July on the Modernisation of Agricultural Holdings, and shall be subject to the lapse provided for subdivision licences in the Law and in the Regulation.
3. Recognition that the building meets the minimum safety and health conditions establishes the physical fitness of the building for use, but does not presuppose compliance with the requirements and conditions that may be required to authorise the activities that are or may be carried on in it.
4. Once recognition of the situation treated as non-conforming has been granted, conservation works, refurbishment works and works adapting the buildings to the activities carried on in them may be carried out, as may the introduction of other uses and activities compatible with territorial and urban planning. These works are subject to a licence, unless they are actions of minor constructional scale and technical simplicity that do not require a project under the legislation in force, in which case they shall be subject to a responsible declaration.
Uses and works that entail an increase in the ground coverage or built volume, or that lead to new breaches of the provisions of territorial and urban planning, may not be authorised. Projects that show that there is no alternative solution for building ancillary elements of the building that are necessary to guarantee the conditions of safety, health, habitability and accessibility, in compliance with the rules applicable to the uses and activities carried on in it, may be exempted from these conditions.
5. Where buildings recognised in the situation treated as non-conforming do not have access to the basic services of sanitation, gas, water supply and electricity provided by utility companies or to telecommunications networks, or where that access was made without the required authorisations, access to them may be authorised provided that no works are needed other than those necessary for connection to the existing infrastructure networks. The companies shall verify the feasibility of the connection on these terms, shall require the resolution recognising the situation treated as non-conforming in order to contract the services, and shall ensure compliance with the applicable sectoral rules.
Where there are no infrastructure networks as described in the preceding subparagraph, access to basic services shall be provided by means of self-contained and environmentally sustainable installations, which must have the corresponding sectoral authorisation.
6. The effects of the resolution are without prejudice to what the corresponding urban planning instrument may decide regarding the development, planning and use of buildings recognised in the situation treated as non-conforming.
7. The declaration treating the building as non-conforming shall be recorded in the Land Registry by a marginal note on the registry folio of the property subject to that declaration, on the terms laid down in State legislation.
Where this sits
Previous: Licence procedure, validity and transfer. All translated laws: Spanish laws in English.
Related on voixa.es: Personal tax in Andalusia; Spain’s 100% property tax for non-EU buyers: what happened.
Nothing here is advice on your own position, and this reading is not the official text. Spain publishes no official English version of this decree; where the wording matters to a decision, read it against the Spanish original published in the BOJA.