The Valencian Building Quality Act: the occupation licence and the Building Book
Law 3/2004 on the Organisation and Promotion of Building Quality (LOFCE), the provisions a buyer of a Valencian home meets: the building and occupation licences; the rule that the occupation licence must be renewed on a resale or a new utility contract once ten years have passed since the first one; the completion certificate, the handover of the works and reservations noted in the deed; the Building Book given to owners; and the owner’s duty to maintain the building.
The ten-year rule
Under article 33.2, once ten years have passed since a building’s first occupation licence, it must be renewed when the property is sold again or a new water, gas or electricity contract is needed; a property that never had one needs one in the same cases (article 33.3). Under the fifth additional provision the “licence” is now whatever enabling title the planning legislation requires for occupation; under article 233.1.f of the Valencian planning law, first and later occupation of a dwelling is by responsible declaration. Before buying an older resale home, check whether that title is in force or who will obtain it: the application needs a technician’s certificate (article 34.2 and 34.3). The Valencian Housing Act states the same requirement on the transaction side (see our buying and letting page).
Title I. Object and scope of the law (selected)
Article 2. Scope
1. This law applies to the building process, within the Valencian Community, whose result is a building which, according to its main use, falls within the following groups:
a) Buildings whose main purpose is residential in all its forms, administrative, health, religious, educational and cultural.
b) Buildings assigned to aeronautical, agricultural and livestock, energy, hydraulic, mining, telecommunications (referring to telecommunications engineering), land, sea, river and air transport, forestry, industrial, naval, sanitation and hygiene engineering activities or uses, and ancillary to engineering works and their operation.
c) All other buildings whose uses are not specified in the preceding groups.
2. The following shall be considered building for the purposes of this law and shall require a project as established in article 10:
a) New building works, except constructions of minor constructional scope and technical simplicity that do not have, occasionally or permanently, a residential or public character and are carried out on a single floor.
b) Works on existing buildings, of extension, modification, reform or rehabilitation, that alter their architectural configuration, meaning those that are a total intervention or partial ones producing an essential variation in the general external composition, the volume, or whose purpose is to change the characteristic uses of the building. Also works that essentially modify the whole structural system or other elements or parts of the building affected by the basic building requirements, as described in article 4 of this law.
c) Works that are a total intervention in listed buildings or buildings having some type of environmental or historic-artistic protection, regulated by a legal rule or planning document, and other partial works affecting the elements or parts subject to protection.
3. The fixed installations and own equipment of the building, as well as the urbanisation elements that remain assigned to the building, are considered included in the building.
4. Works prior or preparatory to building and total or partial demolitions of the buildings referred to in this law shall be governed by its provisions as far as applicable.
5. Existing buildings corresponding to a local type validated by tradition in its use, or which must be conserved for cultural reasons, are excluded from this regulation. The scope of this exclusion shall be determined by regulation.
Title III. The building process (selected)
Chapter I, Section 3. Execution of the works (selected)
Article 19. Completion of the works
1. On completion of the works, their completion shall be formally declared by the final works certificate, signed by the site management, which shall refer to:
a) The conformity of the works to the execution project and, where applicable, to the modifications approved by the public administration, documented in the final works project.
b) Evidence of compliance with the quality level provided for in the project, through the Works Quality Management Book.
c) The sufficiency of the planning services required under the Municipal Building Licence and the connection to the corresponding infrastructure networks, and, where applicable, the guarantees necessary for the restoration of services and infrastructure provisionally affected.
d) Its availability to be used for the purpose for which it was built.
2. The works director shall deliver to the developer, together with the final works certificate mentioned above, the final works project describing the building as built, so that the user and any other interested persons may have exact knowledge of it, its installations, the final characteristics obtained and the intended uses of the building.
This is without prejudice to the technician certifying, in that final works certificate, in order to register completed new buildings, that the description seeking access to the Registry matches reality and the project for which the licence was obtained.
Article 20. Acceptance of the works
1. Once the final works certificate has been issued, the site management shall inform the developer and the builder of this, for the purposes of acceptance of the works, the act by which the builder hands them over to the developer and the developer accepts them, all in accordance with the State building legislation.
The effects of handover of the works, where the developer and builder are the same person, begin when the site management informs it of the issue of the final works certificate.
2. At the act of acceptance of the works, the main builder shall deliver to the developer all the technical and administrative documents it must hold that are necessary to complete the documentation of the executed works referred to in article 21 of this law.
3. In accordance with the State building legislation, and specifically with reference to the possibility of reservations by any of the parties in the acceptance record, if the reservations have not been duly remedied, thereby preventing the effective application of the required guarantees, this must be recorded in the registry entry and the corresponding deed, in order to provide adequate information to the interested parties.
Article 21. Documentation of the executed works
The resulting building must be documented, including its technical characteristics, the quality level achieved as regards the basic building requirements and the appropriate instructions for its use and maintenance.
1. The Generalitat shall develop by regulation the Building Book which, including the documentation required by the State building legislation, shall be delivered to the end users of the building and shall contain:
a) Administrative and legal documentation: identification details of the agents involved in the works, acceptance record of the works, administrative authorisations and any other documents determined in the implementing rules.
b) Technical documentation: the final works project, and the technical information on the building, its constructional elements, materials and installations determined in the implementing rules.
c) Use and maintenance documentation: information on the conditions of use of the building, and instructions for the proper maintenance of it, its elements and installations.
2. Where the building contains various parts capable of being sold to different persons, partial books for the dwelling or premises must be prepared containing references to the data in the Building Book, so that the user knows of its existence and the possibility of consulting it.
They shall also contain the specific information on the dwelling or premises necessary for its proper use, maintenance instructions and information for emergencies or evacuation, with the minimum content determined in the implementing rules.
Chapter I, Section 4. Useful life of the building (selected)
Article 23. Useful life of the building
1. The useful life of the building is the estimated period of time during which it can be used in the required quality conditions, provided that the instructions for use and maintenance have been observed and the necessary rehabilitation works have been carried out.
2. For the purposes of this law and without prejudice to the legislation in force on the matter:
a) Use means the activity carried out in the building by its occupants, according to its purpose and characteristics, and with the diligence necessary so that its quality does not deteriorate.
b) Maintenance means the activity carried out by the owners or, where applicable, the occupants of the building, with the necessary frequency, carrying out the operations and work necessary to maintain its quality level during its useful life. This is without prejudice to the repair works that other building agents may be obliged to carry out as a result of the liability falling on them under the State building legislation.
c) Rehabilitation means the intervention necessary when periodic maintenance operations are insufficient to keep the building in adequate condition. It is the action carried out on all or part of the elements of an existing building so as to obtain quality levels as regards the basic requirements that tend to reach, as far as possible, those of the original state of the building, or in certain cases levels equivalent to those required by the rules in force at the time of carrying out that action.
To determine the appropriate quality levels, the original and current state of the building, the criteria of the original and current rules, and the agreement of the technicians involved and of the owners must be taken into account. Rehabilitation works may affect all or some of the basic building requirements, being in all cases consistent with the state of the building to be rehabilitated.
Article 24. Duty of maintenance and rehabilitation
1. Owners of buildings must keep them in conditions of functionality, safety and habitability sufficient to obtain the occupation licence for the use to which the building is put, in accordance with the instructions in the Building Book.
2. During the useful life of the building, the owners shall carry out the maintenance work periodically provided for in the Building Book, recording in it the operations carried out and their date, and any follow-up required. This work shall be carried out by the users themselves, or by specialised technicians or operatives, or by control entities as the case may be, whose identification shall also be recorded in the Building Book.
All users shall have the instructions for use and maintenance of their dwelling, premises or the part of the building for their private use that corresponds to them under article 21.2 of this law.
3. The instructions for use and maintenance of the building shall in no case entail the non-application to, or transfer to, its owners and users of the liabilities which, under the State building legislation, correspond to other building agents.
4. Where a building has been rehabilitated, it shall have a Building Book appropriate to the level of intervention carried out, setting out the maintenance operations to be carried out and their periods, and the instructions for use.
5. To have a preferential right to aid or incentives for the rehabilitation of buildings with public financing, it shall be necessary to evidence that at least the minimum maintenance operations, and the technical inspection where applicable, have been carried out in accordance with article 87 of Law 6/1994 of 15 November and the conditions to be determined by regulation.
Chapter II. Administrative authorisations
Article 26. Administrative licences and authorisations
1. The construction of buildings, the execution of works on them and their occupation shall require the mandatory municipal building and occupation licences and other appropriate administrative authorisations.
2. The town council shall grant the Municipal Building Licence and the occupation licence in accordance with the provisions on competence and procedure of the local government legislation, the common administrative procedure legislation and any other applicable legislation, and the conditions established by the Generalitat by regulation.
3. Before the works start, the developer shall provide at least the builder and the site management involved in the construction with a copy of the licences and authorisations necessary for the execution of the works.
4. In all building works, it shall be an essential requirement to have on site an authorised copy of the Municipal Building Licence or, where applicable, the documents evidencing that it was obtained by Administrative Silence.
Section 1. The Municipal Building Licence
Article 27. Municipal Building Licence
1. The Municipal Building Licence is the act by which the Town Council authorises the developer to carry out the building works in accordance with the provisions and specifications of the project submitted, and recognises that it conforms to the planning, the planning legislation, the building legislation as regards the basic quality requirements, and any other concurrent sectoral legislation according to the characteristics and uses of the building.
2. Every act of building included within the scope of this law is subject to prior obtaining of the Municipal Building Licence.
3. The Municipal Building Licence does not include the planning management processes necessary to give the plot the status of building plot, which must be processed in a separate file in accordance with the planning legislation.
4. Municipal building licences shall be granted without prejudice to the right of ownership and to third parties, unless they affect public domain or patrimonial land.
5. The grant or refusal of municipal building licences must be adequately reasoned, indicating the legislation or rules justifying it.
6. The grant of the Municipal Building Licence shall be required for the authorisation and registration of deeds declaring new buildings, in accordance with the provisions of the legislation in force.
Article 28. Single decision
1. The municipal building licence has the character of a single decision, and shall implicitly include the grant of the other licences that may correspond. Where this licence includes acts, operations or activities requiring an integrated environmental authorisation, environmental licence or opening licence for public shows or activities open to the public, the administration shall verify in a single procedure compliance with the planning rules and those arising from the other sectoral legislation.
Notwithstanding the preceding paragraph, the building licence may be processed and granted even if the environmental licence or opening licence for public shows or activities open to the public has not been obtained, provided that the person having civil disposal of the property assumes full responsibility for the consequences that may arise from any subsequent refusal of the licence not yet granted.
The assumption of full responsibility must be recorded in a notarial public instrument or before the secretary of the town council, and that condition must be registered in the land registry.
This rule shall not apply to building licences on non-developable land, which shall always require the prior grant of the other required licence.
2. However, in the case of buildings whose main use is residential and which additionally include garages, provided that these are linked exclusively to their respective dwellings or serve the owners or tenants of these or of the premises of the building itself, the Municipal Building Licence shall implicitly include the grant of the activity licence for the garages, and the administrative procedure regulated by the specific legislation on classified activities shall not apply in these cases, the Town Council having to verify that the project complies with the rules applicable to garages, and that the works carried out conform to that project, for the relevant purposes of subsequently issuing the occupation licence.
Article 29. Procedure and periods
1. In addition to the preceding articles of this chapter, municipal building licences shall be granted in accordance with the following rules:
a) Applications must be submitted accompanied at least by the corresponding basic project, with copies for each of the bodies or departments that must report on the application and the other documents essential to give content to the decision, and by the duly completed statistical forms for monitoring building activity established by regulation by the general State administration and that of the Generalitat. If the Town Council observes various deficiencies in the project submitted, the requirement to remedy them shall be made in a single act.
b) Applications for a Municipal Building Licence shall be decided, generally, within two months, without prejudice to the need to adopt appropriate measures to integrate into the single procedure established in article 28.1 of this law the requirements laid down by law or regulation for the grant of licences or authorisations.
However, where the corresponding activity licence must be obtained in order to obtain that Municipal Building Licence, the period for deciding shall be three months.
2. Town councils may establish special measures to speed up the processing and procedure for granting building licences in cases where the project has been submitted to the control or verification system regulated by the Generalitat.
3. The execution of the works within the scope of this law, covered by the Municipal Building Licence authorising building, may only be carried out after submitting to the town council the execution project and the health and safety study, where required by the applicable legislation.
4. Modifications to the project entailing an alteration of the conditions on which the Municipal Building Licence was obtained shall require a complementary licence.
Article 30. Administrative Silence
Once the period for deciding has passed, without prejudice to any appropriate extensions, without the decision having been notified, the interested person may consider the application granted by Administrative Silence, with the effects and conditions established for planning licences in the Law Regulating Planning Activity.
Article 31. Supplies
For the execution of the works, companies supplying water, electricity, gas, telephone and other urban services may not contract and provide their respective services unless the corresponding Municipal Building Licence is first evidenced.
Section 2. The Municipal Occupation Licence
Article 32. Municipal Occupation Licence
1. The Municipal Occupation Licence is the act that recognises and protects the fitness for use of the buildings referred to in this law, whether in whole or in any of their parts capable of individual use. Its purpose is to verify that the works executed conform to the project for which the Municipal Building Licence was granted.
2. For all existing buildings, whether in whole or in the parts capable of individual use, the purpose of the Municipal Occupation Licence is to verify their conformity with the applicable rules, according to the use and characteristics of the buildings.
3. Companies supplying electricity, water, gas, telecommunications and other services must require the occupation licence for contracting with the end users of the respective services.
Article 33. Requirement of the Municipal Occupation Licence
1. Obtaining the Municipal Occupation Licence shall be required once the works within the scope of this law have been completed.
2. Once ten years have passed since the first occupation licence was obtained, its renewal shall be necessary in the following cases:
a) Where the second or later transfers of ownership occur.
b) Where it is necessary to enter into a new water, gas or electricity supply contract.
3. In the case of existing buildings, whether in whole or in any of their parts capable of individual use, that did not previously have the Municipal Occupation Licence, obtaining it shall always be necessary in the cases indicated in letters a) and b) of the preceding paragraph.
4. Whenever works included in letters b) and c) of article 2.2 of this law are carried out or there is an alteration of the use of the building, obtaining the occupation licence shall be mandatory, regardless of the time elapsed since the previous one was obtained, where applicable.
5. In the case of newly built protected dwellings, the final classification shall replace the occupation licence on the first transfer of the dwelling.
In second or later transfers of dwellings with public protection, the preceding paragraphs of this article shall apply.
Article 34. Procedure and periods
1. To obtain the first occupation licence, the developer shall be obliged to apply for it to the town council, for which purpose it must necessarily provide the acceptance record of the works together with the final works certificate.
2. To obtain later occupation licences, the owners must apply for them to the town council, providing a certificate from the competent professional that the building or, where applicable, the part of it capable of individual use, conforms to the conditions on which the first or previous occupation licence was granted. A copy of the corresponding Building Book shall also be provided.
3. In the case of an existing building without a previous occupation licence that needs to obtain one for the reasons contemplated in article 33 of this law, the owners must apply for it to the town council, likewise attaching a certificate from the competent professional that the building or, where applicable, the part of it capable of individual use conforms to the conditions required for the use to which it is put.
4. Verification of compliance with the relevant conditions for the grant of the occupation licence, whether for first or later occupations, shall correspond to the municipal technical services.
5. The period for granting the occupation licence shall be one month from the filing of the application.
6. Town councils shall keep a special register in which all applications, grants and refusals of occupation licences shall be entered, specifying in each case whether they are for first or later occupations, and must inform the Generalitat for statistical monitoring purposes, in accordance with the conditions to be established by regulation.
Article 35. Administrative Silence
Once the period for deciding has passed, without prejudice to any appropriate extensions, without the decision having been notified, the interested person may consider the application granted by Administrative Silence, with the effects and conditions established for planning licences in the Law Regulating Planning Activity.
Article 36. Administrative coordination
1. The Generalitat may issue the rules necessary to organise municipal activity in the grant of occupation licences, both first and later ones, inspection and revocation.
2. It may also issue general technical instructions and request, at any time, information on municipal management and make the relevant requirements to remedy the deficiencies observed.
Additional and transitional provisions (selected)
Second additional provision. Compulsory Building Book
Every building which, in accordance with article 87 of Law 6/1994 of 15 November Regulating Planning Activity, is subject to periodic inspection must have the Building Book with the scope and content to be established by regulation.
Fourth additional provision. Administrative authorisations
The regulation on administrative authorisations referred to in Chapter II of Title III of this law shall apply, from its entry into force, to buildings whose main purpose is residential.
The content of this Chapter II of Title III may be applied, in whole or in part, to buildings intended for uses other than residential by decree.
Fifth additional provision. Enabling title for the occupation of buildings
All references in this law to the terms “municipal occupation licence” or “occupation licence” must be understood as referring to the enabling title for the occupation of buildings in accordance with the planning legislation in force, whether a responsible declaration or a licence.
Second transitional provision. Period for the effective application of municipal building and occupation licences
1. Until town councils adopt the appropriate measures to implement the Municipal Building Licence and the occupation licence of the building, the system of authorisations and licences currently in force shall apply.
2. Within one year from the entry into force of this law, town councils shall adopt the measures necessary for the effective application of the provisions of this law for the introduction of the Municipal Building Licence and the occupation licence.
3. Until town councils adopt the appropriate measures to implement the occupation licence, the regional legislation in force on obtaining and issuing the habitability certificate shall apply.
Where this sits
The state Building Act sets the building agents’ duties and the guarantees; the Valencian Housing Act makes the occupation licence a condition for selling, letting and connecting utilities; and the planning law, with the responsible declaration for occupation, is on the Valencian planning law page.
Related on voixa.es: Valencia: highest income tax, lowest wealth tax; Spain’s 100% property tax for non-EU buyers: what happened.
Nothing here is advice on your own position, and this reading is not the official text. Where the wording matters to a decision, read it against the Spanish original published in the DOGV.